Re: Coppell Road Project # ST 98 -01
Dear Mr. Teter:
August 21, 2000
I have received your information concerning the tonnage for the fittings associated with water
line construction along Coppell Road. I have reviewed the construction plans, specifications,
NCTCOG specs, City of Coppell construction details, etc. and it is my opinion that the tonnage
on this project should be 5.25 tons. My calculation is based on the following:
1. There are numerous items, especially 12 "x6" Tee's, included in your calculations which are
necessary for the installation of the fire hydrant assembly. That was a separate bid item and
was bid to be complete and in place. The pay item was full compensation for all materials,
equipment, tools, labor and any incidentals necessary to complete the work. Obviously, to
install a fire hydrant it has to be connected to the main line. Therefore, the fire hydrant
assembly, as bid on this project, was full compensation from the water main to the fire
hydrant.
2. You also included fittings for connections to existing water mains. Pay Items 16, 17, 18 & 19
for connections to the existing water system specifically states that it should include all
fittings to complete the work. At each of those connections you included a cross because
there was a new water line proposed to go opposite from the existing water line. Therefore,
in my calculations of the fittings I have only included the difference from a Tee to a Cross.
To connect the existing line to the new line a Tee would have had to be installed for the four
8 -inch connections and the one 16 -inch connection. So again, my calculations include not a
Cross but only the difference between a Cross and a Tee.
3. I have never included assessory packs as part of the tonnage on a fitting. However, in an
attempt to bring this to conclusion, I have included assessory packs, but only assessory packs
for the items that do not include fire hydrants or connections to existing mains.
The following are the items of which I have included in my calculations:
1. 1 12 "x6" Tee You included 18 additional 12 "x6" Tees, but
those are located on fire hydrant assemblies.
255 PARKWAY * P. 0.80X 478 * GOPPELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673
As previously stated, I only included the
difference from the Tee to the Cross.
As previously stated, I only included the
difference from the Tee to the Cross.
As previously stated, I did not include
assessory packs associated with fire hydrants
or connections to existing mains.
The total pounds for the items listed above is approximately 10,500. Therefore, the tonnage
would be approximately 5.25.
Your letter of August 14, 2000 also requested 14 additional Calendar Days be added to your
contract. There is no basis in your letter to justify a request for additional time. I would call
your attention to the Standard Specifications for Public Works Construction North Central Texas
Council of Governments Item 1.36 Delays, extension of time, liquidated damages which clearly
states "The contractor shall be entitled to an extension of working time under this contract only
when claim for such extension is submitted to the owner in writing by the contractor within 7
days from and after the time when any alleged cause of delay shall occur and only then when
such time is approved by the owner. " It should also be noted that the Standard Specifications of
the Contract Item 1.36 was amended to add the following sentence: "No extension of contract
time shall be allowed unless the contractor can demonstrate the delay cost an adverse impact to
the critical path and that loss of time cannot be made up by revising the sequence of the work on
the project." Based on the contract, something should have occurred between August 7th and
August 14th which caused you to believe that an additional 14 Calendar Days was justified.
Please specify what occurred between August 7th and August 14th, that is 7 days prior to the
date of your letter, that would justify an additional 14 Calendar Days being added to the contract.
If you have any questions concerning these issues please feel free to contact me at 972/304 -3686.
If not, please revise your next submittal on ductile iron fittings to be 5.25 tons.
Sincerely,
r ...., .
Kenneth M. Griffin, P.E.
Director of Engineer /Public Works
4a46
2.
3
12 "x8" Tees
3.
1
12 "x10" Tee
4.
1
12 "x12" Tee
5.
7
8" Plugs
6.
1
12" Plug
7.
1
16" Plug
8.
41
45 Bends
9.
1
90 Bend
10.
4
12 "x8" Crosses
(minus four 12 "x8" Tees)
11.
1
12 "x16" Cross
(minus one 12 "x16" Tee)
12.
94
12" Assessory Packs
As previously stated, I only included the
difference from the Tee to the Cross.
As previously stated, I only included the
difference from the Tee to the Cross.
As previously stated, I did not include
assessory packs associated with fire hydrants
or connections to existing mains.
The total pounds for the items listed above is approximately 10,500. Therefore, the tonnage
would be approximately 5.25.
Your letter of August 14, 2000 also requested 14 additional Calendar Days be added to your
contract. There is no basis in your letter to justify a request for additional time. I would call
your attention to the Standard Specifications for Public Works Construction North Central Texas
Council of Governments Item 1.36 Delays, extension of time, liquidated damages which clearly
states "The contractor shall be entitled to an extension of working time under this contract only
when claim for such extension is submitted to the owner in writing by the contractor within 7
days from and after the time when any alleged cause of delay shall occur and only then when
such time is approved by the owner. " It should also be noted that the Standard Specifications of
the Contract Item 1.36 was amended to add the following sentence: "No extension of contract
time shall be allowed unless the contractor can demonstrate the delay cost an adverse impact to
the critical path and that loss of time cannot be made up by revising the sequence of the work on
the project." Based on the contract, something should have occurred between August 7th and
August 14th which caused you to believe that an additional 14 Calendar Days was justified.
Please specify what occurred between August 7th and August 14th, that is 7 days prior to the
date of your letter, that would justify an additional 14 Calendar Days being added to the contract.
If you have any questions concerning these issues please feel free to contact me at 972/304 -3686.
If not, please revise your next submittal on ductile iron fittings to be 5.25 tons.
Sincerely,
r ...., .
Kenneth M. Griffin, P.E.
Director of Engineer /Public Works
4a46
Ott
W W W
W W W
Xxx
in N 0
000
N N
P�
1 ► �''` b �,
`3 I S
� 15
990
► '��'Z
,.
dot
4v�
S pl
3
e
- 7 6
I t b p 1„5
1 f5
4 1 4 S �S en,Q
► 1 1
t�S
� a 5
4SSi
lay
9 1:J/,10 SE'S 9C),
3 O5 C 1-11!4, ,+
330
5S fit,,; ems.. h., �;�,� 22 0
I(�4 i z tae X45
sollo
C, ¢ a
3
4 — i �� F ( C ` cAy�,' ` atg� p �}ofcFS v1= (D-ix A,
COQ- c O,, h h ot.
t N.l t t tJ i ► r+ta vwl r»,1 hFtit ti. l t Ct� 1 rta t 1 11�t 1 t�1 l l i 1 1
ac �i4
4�
S, t
►0511
S
iz',
31,O) S r 5 w
&MaI
xxx
(A , A An
co
in 00
�
aaa
AAA
NINN
C, S-0- � ', 4 ",+
�,'a �
1 b" r3 c gOSs
�6 " (? S
g S -0
4 s"O
row
AI
it
I.
I.
4�
am
�k
►may
Ito tNo.4
X45: p,.•.,
CI OS 5
c, P ►�.5
4r
LE
4-
I1
;I,4>>
S
1 0 4
6-+b2
7 +d1
- 1+ , 04
"1 -tX4.
'7446
SfOD
-?1 IT
C -I ri,
C) -! 1 8
CH 4
I�.'tO5
ISt3l
16-+gi
16-014
h416
hiIC,
1145q
1I #qL
2 S�v3
a s-c i•s
2(,-Fi74.
- -°� - f 89
';kc
10400
30 fl(�-
3va8
3oz.g
30 3D
3 z-rS&
31-t(;
3 3-117
3313 �
ealo,-. b
q1'e
+
.
10
� plV
y A/�.t
I� Ii
Iz pl�
4 ° 6,"
QI
35 +3.0
3 - 4 09
- 3 X04 CO
3504 -
32)¢q
3`x35/
3�d 7r
36
4 +i �3
4O-44q
4-0-+53
a0-, i3
40-►-7�
4 144$
41-1 S►
431
4311
C,
4U-4 4b-4 b4-
4, -t 9 9
4-3+y,z
4gt$-7
52-1 54.
1 'f b5
S� +v9
S 3Z.
S3t3S
S31si
�ti1n�a y �G
g�� bT62
i�-t oq
29-+ 3q
3 11 C4
Ib Z3f51
1'1�� 3�iSS
5 31b o
I - ►ate --�
1 ! 16,112 ass
V \
5 )
2 ° I i R
� e
Bpd / z-* wz-
/ vas"
A. R.
".0
x T�.c,
a - is �.P. _._....... �- �.a__.�, P, . _ - - -. -. -- - ..,a -- �a. "..f�•.P
t 3 C .. q
qd S. I Q q
I fa ia9
m z x. F c.
..aL -t- a 3 - q.� ....._ ...... ._
tt,
a�ys �
A, A)
AV Ie,
artc�q a If99
ra "� mS I(R "gs.
16 `' lennecNon l��kwey
a�+-�i
ax�l� m�
14.
6 "Jalve Drain
49�'
is x m S x FL. Ta.¢
a�_fiov
is Al y s ° rn �
o?3 + 77
c a x (a m - s x Fl- .Ta
y6'mT
a4 t79
isx!�rn3xFl.74 -1
.3o tov
101 x (a m x F4 74k
30 + cP9
fn
1 ;R 11 A P'
3D -F-sS
Ap
3e+3a
.2 6 p , ,5-
s o.
oZS�'
yS ° M T
a -IR" 6.R
Q6 �- 95
f $ "Canatc�io
�9f�q
a x C.�a,a,m
! -
mZ XFL
A T, 91
3 + ®.9
149 "
✓
12 " Cov7Pe74,4,q
" 3
pax i MT TO-4
4-s
3 p
-3a_
t. 15
F,
Tom
ilmec oil
tvq
D.
TX FL Tee
- - -t std
931716.
_ a '' qo' m_�'._ .__ _..iaxla._m_�_x�.l_ .7_•<�c,.. . %a x.�.m� �.ce
......... . .. ....
+ ge
AF", T&L 1;1(a fn 7
A- A
�4 S
mTX FLT -ee,
Asa +sy
F1 - Atz
/ 2 - w4
1 49 +67
IQ xla ms xF1 7"
l�" Soh
+ b.9
iax �a m�xFL 7,m
ia"
a -
.S; -+ORR
3� cs3 4- 3.6
s 3 - s9 41e t y9 W ts3
Flo t
73 y ►tl" D,' % n P[t � Qe�� �
ys 10 a 7 ra" ys 0 .n0
la'' ".f-.
1��s
- r -
01
/9
�)
2 oe
J
9
\40
AI!L
8 0 .
1401V'
� X3/3 �����
�.� .�M _ ........_ ... _ . - - - --
� -�.?.. _T�►..�.._ ...
_ ...�,9�.� 3#-
Sent By7 ED BELL CONSTR CO;
r 2812326300
2812326300; Aug- 14- OrAdA :57; Page 1
ED BELL CONSTRUCTION COMPANY
1305 FM 359, SUITE J
RICHMOND, TX 77469
FACSIMILE TRANSMITTAL SHEET
TV: PROM:
K en G r I --A I rN Doug Teter, Ed Bell Con Co
COMPAM: DATE:
PAX NUMBER:
TOTAL NO.OP
INCLtJpINCi COVER:
PIIONE NUMSF.R:
1�1:
Upp�.v(
❑ FYI
2 OR REV IFW
❑ PLEASE CONFIRM
❑ PLEASE REPLY ❑ RID r4W
NOTFS /CWMMENTS:
(281) 232.2355 VOICE (281) 232 -6300 FAX
Sent By: ED BELL CONSTR CO;
PAX (Z14) 352.3201
ED BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540747 10605 HARRY NINES
DALLAS. TEXAS 75354 -0767 DALLAS. TEXAS 75220
August 14, 2000
Via Fax 972- 304 -3570
Ken Griffin, P.E.
CITY OF COPPELL
City of Coppell Town Center
255 Parkway Boulevard
P.O. Box 478
Coppcil, TX 75019
RE: Coppell Road
Project # ST 98 -01
EBCC # 946
Dear Mr. Griffin;
TELEPHONE (214) 356.6541
Attached you will find a complete breakdown of the fittings utilized on the referenced project in
the construction of the 12" water line.
It is our understanding that this information has been presented previously via letter dated
February 7, 2000, and while no written response has been provided, we have been told that some
of these fittings are subsidiary to the fire hydrant item. We have attached a copy of the
specification for the fire hydrant item. It clearly states that the hydrant assembly includes the
hydrant, the gate valve and the short nipple between the hydrant and valve. The connection to the
main is not addressed and, therefore should be paid utilizing the fitting item.
Our tonnage of fittings at this time is 12.244. Please initiate a change order to cover payment for
this work. Additionally, this additional work required additional time to complete. Please add 14
calendar days to our contract to cover this time.
If you need further information, please do not hesitate to contact me at 281 -232 -2355.
2812328300; Aug -14- 04:58; Page 2
AN EQUAL OPPORTUNITY EMPLOYER
.v uu
2812328300; Aug -14 -on 14:59,
Page 3
COPPELL ROAD
WATER LINE FITTINGS
- SUMMARY
12" WATER LINE MAIN WEIG
FITTING DESCRIPTION
S & TOTALS
8" PUSH IN PLUG
QTY WTI
TOTAL.
10" PUSH IN PLUG
36 7
252
12" 45 DEG MJ BEND
55 1
55
12" ACCESSORY PACK
215 40
88 00
12" MJ 90 DEG BEND
30 134
4020
12" PUSH IN PLUG
111 1 ✓
111
12" X a" MJ X FL TEE
78 2
156
12")(8" FL CROSS
315 19 Z
5985
1 2" X 8" MJ X FL ADAPTER
385 4
1540
12" X 8" MJ X FL TEE
155 4
620
12" X 10" MJ X FL TFE
330 3
990
12" X 12" MJ X FL TEE
377 1
377
16" ACCESSORY PACK
401 2
802
16" PUSH IN PLUG
45 2
90
16" X 12" MJ CROSS
145 1
145
745 1
745
222
24488
TANS USED
12.244
Sent By: ED BELL CONSTR CO;
' r-
i
r i / Pay Item I&A9,10,11:
`fG
2812326300; Aug-14- 14:59; Page 4/12
GATT VALV= AM BOXIi'S
All Este valves shall coaform to NOMOO lttm 2.13 and the AWWA .
Valves. 2" dnvsk 49 for Water and Sewgt
ANSI/AWWA. C309 Otter mvision). All jut valves shall be iron body, ba..
mounte4 wedged dirt, milim ntbber sea. sonrisinj stem hwentl wedging type 200
psi working pressure. U1L listed and FM approved. Valves shall close by corning the
hndwbW clockwise. hymaat ft adjastmeat of valve cover runs to alas! grade shall be
made sepaately. Provide valve attar O tsotbas as required to maintain valve stems 18"
minhumn below finished pmde.
t Measurameot and payment shay be spade on the bosh of the unit price bid per emb and
A" be 1b11 cotapenastion for tlstffi bk& and WKaRiAj do valve. tau iron valve box.
necessary valve stoma eatteasions. connote sappmt blockiag. other materia* equipment.
tools, Labor and incidentals steamy to oOMMe the work,
' Pay Item L.13: 3 AM RSLXA98 VALVE
All 2" sit telean valves slogs ovnform to NCTCOG Item 2.13.2 and City of Coppell
Standard Detail SDIS. Mato boat lion valves shall be located a minimum of two feet
behind curb and outside ofthaAdewWk or bfke.ttvil areas•
t Pay Unn U 13,14: FIRE HYDRANT AND GATE VALVES
Pee hydrants shall be tlu gdod and kwalbd, except for those to be relocated. at the
locations sWwn on the Plans. Ocala City approved the hydrants shall be wed. Constmet
per City of Coppell standard detail alas, SD and vk* with C.ky prior to ordaxnj.
uo��bsll�inchtda hR add s�ott 6" qNplo between 00 valve sad h dnot.
Valves shall plow by =mmg the ha�el c3ockwift.
' As shower on the plaar, one fire hydrant waembly is to be mmoved. salvaged. cleaned
ad relocated. Relocated Me bydam sbari be constructed pat City Standards.
MeasmMUMM and psymant abali be made on the basis of tb prlos bid per each for the
i� .,AN Y• WoNding iiYr n tai, complete in pbA e. and shall be W
■ compensation for all n statuls, egwpman. tools. labor and incidentals Onessaty to
■ complete the work.
Pay Item I:r -1.i: RZCOMGWT 8X13'l WAS MMVWW
!his stets alaa iacelvde dtsooaaeef3osa and reconaeattos the wdstinj water services to the
new 12" want nwo. Servbes shall be aed in acc4rds4ee with M=00 IMM
2.16 sad City of Coppoll Standard Detail al" SDI S.
44
N
d
co
COPPED. ROAD
a
WATER LINE
FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
0C
z
0
o
a
c
w
'K
p
w
W
w
LL!
w <
Y
z
F-
IL
z
w
a
z
w
w
w
F
J
f-
a
G9
tl!
C
c
O
J
J
m
�,
m
J
J
U.
O
J
LL
J
AL
W
IL
�'
p
v
Q
V
d
O
9*
W
G
IL
=_
X
V
X
X
X
1
X
1
O
0 0
a
_
V
a
a
=
O
N
H
0
V
io
6
6
ao
r
r
V
rA
C4
F
t
L
d
d
�C
X
x
!c
X
X
4
d
x
IL
0
6
O
V
N
T
M
r
N
e+
N
r
lV
r
N
N
r
N
r
N
r
!+!
r
1p
r
10
r
iD
a-
1+00
12" PUSH IN PLUG
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
1
2 +77
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
2 +77
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
0
0
5+80
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
m
co
clu
5 +80
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
N
6+62
12" X 8" FL CROSS
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
6+62
12"' X 8" MJ X FL ADAPTER
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
N
6 +62
8" PUSH IN PLUG
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
7 +01
12'45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
7 +01
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
7 +04
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
D
0
0
0
0
1
7 +04
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
7 +24
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
7 +24
12" ACCESSORY PACK
2
0
0
0
2
0
D
0
0
0
0
0
0
0
0
0
2
7 +28
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
D
0
0
0
0
1
7 +28
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
D
2
z
8 +80
12" X 6" MJ X FL TEE
1
D
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
8 +80
12" ACCESSORY PACK
2
0
0
0
2
0
D
0
0
0
0
0
0
0
0
0
2
J
9 +15
12'45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
m
9 +15
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
D
0
0
0
0
2
w
9 +18
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
m
c
N
m
ti
COPPELL ROAD
WATER LINE
FITTINGS BASES
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
OC
°
z
o
o
�
�
w
n~.
�
w
w
w
u
a
w
Z
C9
W
W
C7
�
!-
4C
H
IL
U'
c
0
U
d
3
J
m
�►
p
m
w
J
d.
J
C
V
J
J
LL.
x
I L
x
O
d
V
Z
z
a
Z
x
j
x
j
x
j
'
Z
D
W
D
V
$
U.
z
z
e
o
V
a
'
a
t
b
M
If
a
x
x
x
x
x
x
x
LL.
V
!
O
r
N
V.
k
r
N
T.
N
r
N
r
N
r
N
T.
N
q"
N
r
N
r
tp
r
Ip
V-
m
9+18
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
9 +38
12"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
9 +38
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
0
9 +42
12" 43 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
< tO„
9 +42
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
co
11 +80
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
cc
11 +80
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
N
15 +32
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
D
0
0
0
0
1
15 +32
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
D
0
0
0
0
0
0
2
16+09
12" X 8" FL CROSS
1
D
0
0
0
0
D
0
1
0
0
0
0
0
0
0
1
16+09
12" X 8" MJ X FL ADAPTER
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
16 +09
8" PUSH IN PLUG
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
16 +93
12"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
16 +93
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
N
16 +96
12'45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
D
0
1
16 +96
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
z
17 +16
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
D
0
0
0
0
1
17 +16
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
J
17+19
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
m
17 +19
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
0
18 +50
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
w
m
c
y
m
'ST
rn
ti
a
,.
c� c
a
0
0
03
co
N
N
m
N
0
U
cc
z
0
U
J
J
w
m
0
w
m
c
d '
2
1
2
1
2
1
2
1
2
2
2
1
1
2
1
2
1
2
1
2
z
a
COPPELL ROAD
a
O
H
W
�
o
z
z
18 +50
12" ACCESSORY PACK
21 +55
12" X 6" MJ X FL TEE
21 +55
12" ACCESSORY PACK
21+67
12" 45 DEG MJ BEND
21+67
12" ACCESSORY PACK
21 +69
12" 45 DEG MJ BEND
21 +89
12" ACCESSORY PACK
21 +92
12" 45 DEG MJ BEND
21 +92
12" ACCESSORY PACK
23 +51
16" x 12" MJ CROSS
23 +51
16" ACCESSORY PACK
23 +51
12" ACCESSORY PACK
23 +51
16" PUSH IN PLUG
23 +79
12" X 6" MJ X FL TEE
23 +79
12" ACCESSORY PACK
25 +07
12" 45 DEG MJ BEND
25 +07
12" ACCESSORY PACK
25+08
12"X 6" MJ X FL TEE
25 +08
12" ACCESSORY PACK
25 +15
12" 45 DEG MJ BEND
25 +15
12" ACCESSORY PACK
2
1
2
1
2
1
2
1
2
2
2
1
1
2
1
2
1
2
1
2
COPPELL ROAD
WATER UNE
FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
OG
zz
Y.
Q
z
w
W
O
w
Y
4
w
0
w
0.
ul
O
F-
tl�3
`
i-
J
J
�
C9
0
J
IL
d
0
W
d
K
V
K
YC
X
X
O
Q.
V
Z
�
0
z
J
Z
W
=
N
a
t�
$►
y
U.
ap
o
N
V
x
r
o�.
d
b
K
a0
x
�o
x
x
r
x
r
x
4
d
r
K
!
Q
N
N
N
N
N
N
N
N
iV
N
a
O
fa
6
r
r
r
r
r
r
r
r
r
r
r
r
r
r
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
D
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
D
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
D
0
0
0
0
2
D
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
d
0
0
0
0
0
0
0
0
0
0
0
0
1
2
0
0
0
0
0
0
0
0
0
0
D
0
2
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
D
0
0
0
0
0
0
0
0
1
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
D
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
d
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
D
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
D
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
D
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
D
0
0
0
0
2
1
2
1
2
1
2
1
2
2
2
1
1
2
1
2
1
2
1
2
„
o
d
ti
EL
0
�n
c
v
rn
a
0
0
0
co
(M
N
a)
(V
I
U
cr
F-
w
Z
0
U
J
J
w
m
0
L
>1
m
c
a)
COPPELL ROAD
WATER LINE FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
oc
O
D
V
D
w
W
W
W
U
Z
d
Q
W
W
Q
~
y
`
F
.�
O
O
Q
7
J
m
J
1
O
k
j
LL
�
.�.
H
H
V
W
J
d
Z
•
O
W
W
C
a.
?
x
V
x
!C
x
Q
H
a
=
C1
G
Z
C7
�
J
LL
�
�
.7
oo
a
s
<
2 04
m
x
x
x
x
x
x
4
a
x
O
ao
0
94
t4
44
94
04
.-
40
25+95
12” 45 DEG MJ BEND
1
0
0
1
0
0
D
0
0
0
0
0
0
0
0
0
1
25 +95
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
26+04
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
26 +04
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
26 +79
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
26 +79
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
29 +69
12" X 8" FL CROSS
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
29+89
12" X 8" MJ X FL ADAPTER
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
29 +89
8" PUSH IN PLUG
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
30+00
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
30+00
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
D
0
2
30 +05
12" 45 DEG MJ BEND
1
D
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
30 +D5
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
30+08
12'"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
30+08
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
30+28
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
30 +28
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
30+30
12"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
30+30
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
32 +68
12" X 12" MJ X FL TEE
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
1
32 +58
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
V
d
rn
a
0
r
c �
rn
a
0
0
M
co
N
N
co
N
o
U
cc
Z
0
U
J
J
w
m
0
w
co
4
cn
222
1
2
1
2
1
2
1
2
i
1
2
1
1
1
1
2
1
2
1
2
Z
O
COPPELL ROAD
IL
O
0:
d�
lu
p
WATER LINE
FITTINGS BASIS
Z
Z
U .
32+91
12" X 6" MJ X FL TEE
32 +91
12" ACCESSORY PACK
33 +15
12" 45 DEG MJ BEND
33 +15
12" ACCESSORY PACK
33 +17
12'45 DEG MJ BEND
33 +17
12" ACCESSORY PACK
33 +37
12" 45 DEG MJ BEND
33 +37
12" ACCESSORY PACK
33 +39
12" 45 DEG MJ BEND
33 +39
12" ACCESSORY PACK
37+00
12'X $" MJ X FL TEE
37 +00
12" ACCESSORY PACK
38 +04
12" X 8" FL CROSS
38 +04
12"X 8" MJ X FL ADAPTER
38 +04
8" PUSH IN PLUG
38 +49
12"45 DEG MJ BEND
38 +49
12" ACCESSORY PACK
38 +51
12" 45 DEG MJ BEND
38 +51
12" ACCESSORY PACK
38 +71
12"45 DEG MJ BEND
38 +71
12" ACCESSORY PACK
222
1
2
1
2
1
2
1
2
i
1
2
1
1
1
1
2
1
2
1
2
COPPELL ROAD
WATER LINE
FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
oC
O
D
W
CL
CL
W
W
W
`
N
m
w
O
F
4
j
C
J
d
O
>
�
LL
de
u-
u-
x
x
0
O
d
C>
IL
Z
uJ
°
Z
x
x
X
3
H
Z
W
=
w U
fA
e
O
er
U
= I1
O
'
O
x
x
eo
x
eo
x
eo
x
'
x
'
x
V
t
O
a.
v
x
O
N
N
N
N
N
N
lV
N
N
N
iD
6
1D
o
r
,r
,-
r
�-
r
r
r
r
r
r
r
r
r
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
D
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
D
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
222
1
2
1
2
1
2
1
2
i
1
2
1
1
1
1
2
1
2
1
2
V
0
d
rn
M
CL
0
ui
rn
a
0
0
co
N
M
(NJ
m
N
U
cr
F-
co
z
0
U
J
J
w
m
0
w
m
c
m »
m
222
1
2
1
2
1
2
1
2
1
2
1
1
2
1
2
1
2
1
2
1
z
O
COPPELL ROAD
a
o
H
W
�+
o
Z
WATER LINE
FITTINGS BASIS
U
38 +74
12" 45 DEG MJ BEND
38 +74
12" ACCESSORY PACK
40+18
12"X 6" MJ X FL TEE
40 +18
12" ACCESSORY PACK
41+45
12" MJ 90 DEG BEND
41 +45
12" ACCESSORY PACK
42 +89
12" X 6" MJ X FL TEE
42 +89
12" ACCESSORY PACK
43 +10
12"X 8" MJ X FL TEE
43 +10
12" ACCESSORY PACK
43 +10
8" PUSH IN PLUG
44 +10
12' X 6" MJ X FL TEE
44 +10
12" ACCESSORY PACK
45+84
12" X 8" MJ X FL TEE
45 +84
12" ACCESSORY PACK
45 +84
8" PUSH IN PLUG
46 +84
12"X 6" MJ X FL TEE
46 +84
12" ACCESSORY PACK
48 +99
12" X 8" MJ X FL TEE
48 +99
12" ACCESSORY PACK
48+99
8" PUSH IN PLUG
222
1
2
1
2
1
2
1
2
1
2
1
1
2
1
2
1
2
1
2
1
COPPELL ROAD
WATER LINE
FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
ix
u
w
H
v
Z
z
W
O
W
w
w
lu
w
m
w
m
t9
J
W
to
O
a
J
J
J
ti
J
IL
IL
ri
a
O
VJ
K
V
X
X
O
d
V
z
z
is
o
z
i
'�
i
i
a
z
w
V)
�
2
fA
W
D
w
C1
=
H
RL
ie
6
e
�
-
cm
V
S
�
r
>
m
>
a
V
a
3
d
io
X
?t
!C
ao
X
x
x
V
a
>
d
�
X
y ,
1-
0
b
O
�
N
r
N
r
N
T
N
V.
N
r
N
r
N
r
N
r
N
w
lV
r
f0
r
1p
r
m
r
1
0
0
1
0
0
0
0
0
0
0
0
o
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
o
o
o
o
o
1
o
0
o
0
o
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
o
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
o
o
o
o
o
1
o
o
o
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
0
0
0
o
0
0
o
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
D
0
0
0
0
0
0
0
0
0
0
0
222
1
2
1
2
1
2
1
2
1
2
1
1
2
1
2
1
2
1
2
1
N
N
CD
ROAD
a
WATER LINE
FITTINGS BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
°
O
O
V
D
W
'�
W
i
V
Z
0
W
CL
W
H
Q
F
C
F
V
d
p
W
IL
J
K
0
J
J
IL
x
Y.
K
p
°.
V
O
Z
mi
D
V
m
eo
*
"K
"X
V
a
Z
d
j
x
X
x
x
x
t
j
a.
a
�t
U.
4D
O
r
N
r
N
r
N
r
N
r
!V
r
N
r
N
r
N
r
44
r
tV
r
6
r
4p
r
6
V-
49+87
12" X 6" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
49+87
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
52 +54
12" X B" MJ X FL TEE
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
52+54
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
co
52 +69
IT X 12" MJ X FL TEE
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
1
N
52 +69
12' ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
co
52+89
12" PUSH IN PLUG
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
1
N
52 +74
12"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
52 +74
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
52 +88
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
52 +88
12" ACCESSORY PACK
2
D
0
0
2
0
D
0
0
0
0
0
0
0
0
0
2
53 +32
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
53 +32
12' ACCESSORY PACK
2
0
0
0
2
0
0
D
0
0
0
0
0
0
0
0
2
53 +35
12"45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
53 +35
12" ACCESSORY PACK
2
D
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
cc
53 +59
12"45 DEG MJ SEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
co
53 +59
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
Z
�°,
40+49
12" 45 DEG MJ BEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
J
40+49
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
m
40 +53
12"45 DEG MJ BEND
1
0
0
1
D
0
0
0
0
0
0
0
0
0
0
0
1
0
40 +53
IT ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
w
m
c
d
m
N
N
N
cb
COPPELL ROAD
a
WATER
LINE
FITTINGS
BASIS
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
0
D
D
W
F
d
Q
W
W
W
IN
Y
V
z
a
C?
W
a
W
a
H
0
Q
�
F-
~
IL
�
w
d
&
1
0
v
z
La
w
0
x
u
x
x
1
0
d
?
m
G
W
z
x
W
W
=
it
1
11
c
=
c
z
g-
C
d
LL
40+73
C
12" 45 DEG MJ BEND
1
�O
0
O
V.
0
N
r
1
N
r
0
N
r
0
tV
�—
it
r
h
r
N
r
N
r
N
r
N
r
1O
r
t0
r
10
r
0
0
0
0
0
0
0
0
0
0
1
40 +73
12" ACCESSORY PACK
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
40 +78
12" 45 DEG MJ SEND
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
40+78
12" ACCESSORY PACs(
2
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
41 +51
12 "X10"MJXFL TEE
1
0
0
0
0
0
a
0
0
0
0
1
a
0
0
0
1
N
41 +51
12" ACCESSORY PACK
2
a
0
0
2
0
0
0
0
0
0
0
0
0
0
0
2
co
41 +51
10" PUSH IN PLUG
1
0
1
0
0
0
0
0
0
a
0
0
0
0
0
0
1
222
7
1
40
134
1
2
19
4
4
3
1
2
2
1
1
222
252
55
8600 4020
111
156
5985 1540
620
990
377
802
90
145
743
24488
o
U
H
co
Z -
O
U
J
J
W
m
0
W
m
C
d '
AUG -14 -2000 09:54
FREESE - NICrHC>LS
FN I I'"' -LAS
Fax Transmittal
TO: Ken Griffin
fax: 972 - 304 -3673
FROM: Scott Maughn, E.T.T.
DATE: August 14, 2000
SUBJECT: . Coppell Rd. Waterline Fittings
Total number of pages including transmittal sheet: 2
P. 01
si.tn W. Freese, Ps. 1900.1990
Mwvlo C. Nichols, P-E. 18961969
If there is a problem receiving any of the pages, please call 214- 920 -2500.
COMMENTS:
Ken
This is the spreadsheet I came up with to show tonage of fittings for the waterline. Both standard
and compact fitting were looked at from the CLOW manual. Please call if you need any additional
information, or have any other questions.
Thanks
-END-
cc:
FREESE AND NICHOLS, INC. • 1701 N. MARKET STREET, SUM 50012 51 a DALLAS, TEXAS 75202 -2001
TELEPHONE: 214 - 920.2500 • PAX: 214 - 920-2565
N
m
CL
Lo
CE
J
J
cr,
z
LL
v
on
ED
Q
CD
i
vC
i
*NO SHORT -BODY FPI"MGS AVAILABLE
N
m
J
a
H
O
H
a '4
COPPELL ROAD - WATERLINE FITTINGS
ITEM
s .14•.� ,4 X11
QTY.
STD. WT
(EA) - LB.
TOTAL
BODY WT
(EA) - LB
TOTAL
12 "x6" TEE
21
325
31 S
6825
110
2310
12 "x8" TEE
4
340
p
1360
125
500
12"x10" TEE
1 ✓
390
3
390
140
140
l2 "xl2" TEE
1 Z--
410
4-o 1
410
160
160
12 "00 HOR]Z. BEND
1
255
► 11
255
125
125
12 "x45 HOR.IZ. BEND
5
215
2 S
1075
105
525
12 "x45 ° PERT. BEND
36
215
�1 S
7740
105
3780
12 "x8" C ROSS*
4
385
1540
385
1540
16 "x12" CROSS*
1 ✓
685
S 685
685
685
8" PLUG*
7 '�
45
315
45
315
16" PLUG*
1 �
150
S
150
150
150
12 "x10" REDUCER*
1
190
190
190
190
250HORIZ. BE
1
220
220
74
74
UG*
1
85
7'$
85
85
85
L6"x900 HORIZ. BEND
1
85
85
44
44
TOTALS
21325 LB.
10.66 TON
10623 LB.
5.31 TON
*NO SHORT -BODY FPI"MGS AVAILABLE
N
m
J
a
H
O
H
a '4
Title :
d
r
19 - $ Co�,� � ^1 b4 62 16 +0 a /29 + / 3-?,-to 4-
2
I I� � 2�-►S
G 1 - 75 — 16 = :-f.09 TOt\
$1 D AM - I Zo 1vN
/o US = 9(0.s
L
20
PLAG5
Fitfin9 S =
n Beds, fiee5,
red�cc�.-s
�v
VV - 7 - 6b)
�«x� .. ro
2
aR
S
12 "x 10"
(qo
1
I?"K12"
I' (oo
I _"
co Date:
c. '(a.r+ A. o 7 BY: K�
��`n Ta n u a r:i 25W a ✓
L 1 °w L _ 5 304 � �orn CL Ka4j)
/:rct (6 1$ 1q)
2ogO
Soo
N o
10
12 "x9o° BEND IZ5 I 12 S
12 "x4So BEND I a5 S 525
C2oss .3GO 4"'- 1ltgo
)( 16" C2oS S (n85 I ✓ C
c�
kc t& y S ' ' 3 coo
r� (j r 1 s o I t so
f� Page Of
FNiiliiMCXOL!