Loading...
Vista Ridge 1st P-CS010530May30,2001' Pamela Telkamp Centex Engineering & Construction 10150 Monroe Drive Dallas, TX 75229-0009 RE: 121 / Vista Ridge Office Development Preliminary Fee Assessment Letter Ms Telkamp: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of' the Development Fee calculations for the referenced development. The fees have been assessed based on the information you faxed to me on May 24, 2001. These fees are subject to change base on future changes to the City's fee ordinance or meter cost. A construction inspection fee of 2% of the cost of private improvements outside the building footprint and 4% of the cost for public improvements will also need to be paid prior to construction plan approval. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Assistant City Engineer 255 PARKWAY ~ P.O.BOX 478 1¥ COPPEI_[_ TX 75019 ~ TEL 972/462 0022 dl'FAX 972/304 3673 Project: Date: DEVELOPMENT FEE TABLE 121 / Vista Ridge Office Development TOTAL AMOUNT DUE ~:~,~\~,~\~'~ FEES D~ P~OR TO ~ CO~CIL I ~PROV~ Water Impact Fee $15,975.~ $15,975.~ (1~ due prior to Council Approval) Water Tap Inspection Fee $150.~ (1~ due at Issuance of Water Meter) Water Meter Fee (Domestic) $189.37 (1~ due at Issuance of Water Meter) Water Meter Fee (Irrigatio~Fireline) $2,7~.23 (1~ due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.~ (1~ due at Issuance of Water Meter) Irrigatio~Fireline Meter Deposit $60.~ (1~ due at Issuance of Water Meter) Wastewater Impact ~e $3,6~.~ $3,6~.~ (1~ due prior to Council Approval) Wastewater Tap I~pection Fee $50.~ (1~ ~ due at Issu~ce of Building Permit) Utility Final Inspection Fee $50.~ (1~ due at Issuance of Building Pe~it) Park Fee $0.~ $0.~ (1~ due prior to Council Approval) Roadway Impact Fee. . $83,7~.~ $83,790.~ (1~ due prior to CoUncil Approval) Street Light Fee Information not Available (1~ due prior to Acceptance of Project Street Sign Fee Info~tion not Available (1~ due prior to Acceptance of Project Const~ction Inspection Fee Information not Available ~OTAL $106,689.~ TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $103,365.00 PROJECT: DATE: Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): DEVELOPMENT FEE WORKSHEET 121 / Vista Ridge Office Development ~ 0~::~ s/3o/o Fireline Meter(s): 1 - 2 inch = 8 ESU's I - 4 inch = 25 ESU's 0 = 0 ESU's I - 6 inch = 2.5 ESU's Total #: 35.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) $15,975.00 Water Tap Inspection Fee: Total 0: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $150.00 Domestic Water Meter Fee: Total 0: 1 Domestic Meter(s) @ $189.37 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $189.37 Irrigation/Fireline Water Meter Fee: Total 0: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) $1,550.85 $0.00 $1,239.38 $1,550.85 $0.00 $1,239.38 Domestic Water Meter Deposit Fee: Total 0: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) $35.00 Irrigation/Fire Meter Deposit Fee: Total 0: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $60.00 Wastewater Impact Fee: Total Domestic Meters ESU's: 8 $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $50.00 $50.00 Page 1 Park Fee (For Residential Developments Only)~,,~..\~\~~ * Preliminary plat approved: Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) $0.00 $o.oo Roadway Impact Fee: (See attached fee calculations) $83,790.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 PROJECT: 121 / Vista Ridge Office Development DATE: 5/30/01 ROADWAY IMPACT FEE: ROADWAY IMPACT FEE CALCULATIONS Service Area * Category ** Land Use ** Building Area (sO 2 Office General Office Bldl~. 70,000 Development Units ** 70.00 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) $300 $83,790.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) ~,~ 214 982 6257 ~.~ ,05/2472001 09:10 FAX 214 902 6 CENTEX ENGINEERING ~001 May24,2001 CENTEX ENOINEEIIIN~I I, I;ON~,TIIUOTION 0150 MOnro~ Drivo IDalla~,. TX 7s225,-gOO9 Phon=: 214,;~57.1691 FlY: 2~14 9(~Z ~387. . Mr. Mike Martin City of' Coppell Engineering Department 255 Parkway Boulevard Coppell, TX 75019 Via Fax: 972-304-3570 Re: 121 / Vista Ridge Office Development Sub: Impact Fees Dear Mike, Per our phone conversation this morning, please calculate preliminary impact tees based upon the following infom~ation: Building usage: Office Building size: 70,000 sq. Ft. Meters: Domestic- I ~ 2" Irrigation- 1 ~,, 4" Fire- 1 ~ 6" If you need additional information, please call me at 214-902-6229 or Mr. Ray Lowrance at 214-902-6350. Fax thc preliminary rates to 214-902-6257 or call and th',mks fi'om Centex Engineering & Construction lbr your help, Executive Assistant