Vista Ridge 1st P-CS 980107Project: Vista Ridge
Date: 1/7/98
DEVELOPMENT FEE TABLE
TOTAL
FEES DUE
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
Park Fee
(100% due prior to Council Approval)
Roadway Impact Fee
(100% due prior to Council Approval)
Street Light Fee
(100% due prior to Acceptance of Project
Street Sign Fee
(100% due prior to Acceptance of Project
Construction Inspection Fee
FOTAL
$40,725.00
$200.00
$4,515.00
$5,114.18
$30.00
$105.00
$36,000.00 $36,000.00
$50.00
$50.00
$0.00 N/A
$236,407.50 $236,407.50
Information not
available at this time
Information not
available at this time
Need submittal of
development contracts
$~23,196.68
TOTAL AMOUNT DUE PRIOR TO COUNCIL ;~ a a ~{el' .~ ', I
DEVELOPMENT FEE WORKSHEET
PROJECT: Vista Ridge
DATE: 1/7/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
1 - 8 inch
I - 2 inch
2 - 8 inch
80
8
2.5
Fireline Meter(s):
Total #: 90.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter(s) @ $4,515.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: Additional Irrigation Meter(s) @
Total #: 2 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$195.98
$2,459.10
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
80
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$40,725.00
$200.00
$4,515.00
$195.98
$0.00
$4,918.20
$30.00
$105.00
$36,000.00
$50.00
$50.00
Page 2
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$236,407.50
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 3
ROADWAY IMPACT FEE CALCULA'£IONS
PROJECT: Vista Ridge
DATE: 1/7/98
ROADWAY IMPACT FEE:
!Service Area *
Category **
Land Use **
Building Size (Scl. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
2
Office
General Office Btfildino
197,500
197.5
3.99
$300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile)
$236,407.50
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)