Loading...
Vista Ridge 1st P-CS 980107Project: Vista Ridge Date: 1/7/98 DEVELOPMENT FEE TABLE TOTAL FEES DUE Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) Wastewater Impact Fee (100% due prior to Council Approval) Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Park Fee (100% due prior to Council Approval) Roadway Impact Fee (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project Street Sign Fee (100% due prior to Acceptance of Project Construction Inspection Fee FOTAL $40,725.00 $200.00 $4,515.00 $5,114.18 $30.00 $105.00 $36,000.00 $36,000.00 $50.00 $50.00 $0.00 N/A $236,407.50 $236,407.50 Information not available at this time Information not available at this time Need submittal of development contracts $~23,196.68 TOTAL AMOUNT DUE PRIOR TO COUNCIL ;~ a a ~{el' .~ ', I DEVELOPMENT FEE WORKSHEET PROJECT: Vista Ridge DATE: 1/7/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 1 - 8 inch I - 2 inch 2 - 8 inch 80 8 2.5 Fireline Meter(s): Total #: 90.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ $4,515.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $2,459.10 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 80 $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $40,725.00 $200.00 $4,515.00 $195.98 $0.00 $4,918.20 $30.00 $105.00 $36,000.00 $50.00 $50.00 Page 2 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $236,407.50 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 3 ROADWAY IMPACT FEE CALCULA'£IONS PROJECT: Vista Ridge DATE: 1/7/98 ROADWAY IMPACT FEE: !Service Area * Category ** Land Use ** Building Size (Scl. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** 2 Office General Office Btfildino 197,500 197.5 3.99 $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $236,407.50 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)