Loading...
Vista Ridge 1st P-CS 881026~' COPPELL PUBLIC ~ORKS October 26, 1988 TO: FROM: RE: Steve Goram, Director of Public Works Steven M. Morton, Chief Developmental Inspector Vista Ridge Steve, as per your request for a construction cost estimate to extend 16" water to Vista Ridge. This project would consist of extending two 16" dip water mains. One would extend to along MacArthur Blvd. from Parkway Blvd. approximately 7000' linear feet with two borings, one lowering at box culvert connection of lakes and one crossing of Denton Creek. The second extension is along Denton Tap Rd. from Parkway Blvd. approximately 3500' linear feet with two creek crossings, one for Cottonwood Creek and one for Denton Creek. On the subject of creek crossings, there, are three options: 1) Aerial @ approximately $50,000.00 each 2) Lowering @ $35,000.00 each 3) Mounting to bridge @ $15,000.00 each I have contacted Dallas County, Denton County, Collin County, Texas Highway Dept., Carrollton, and Plano. In all cases the procedure of mounting the main to bridge is acceptable and there is no regulation to prohibit us from doing this. The construction cost estimate totals are reflective of the three creek crossings being mounted onto the bridge. I am also attaching my unit price calculations which will show the cost of the other crossing options. In conclusion, the 16" dip water main extension along MacArthur should cost approximately $425,500.00 + 15% contingency ($16,305.00), if you desire. To extend 16" water main along Denton Tap, it should cost approximately $268,000.00 + 15% contingency ($40,200.00), if you desire. To extend 12" dip from Magnolia is $18,000.00. Total $730,250.00. of May '88. SMM/bb project cost of $635,000.00, with a 15% contingency is My figures reflect unit prices bid in Coppell to date Attachment Construction Cost Estimate MacArthur Boulevard ITEM 1) 16" D.I.P. 2) 16" Gate Valve w/bypass 3) 12" Gate Valve 4 ) Fire Hydrant 5) Street Bore 6) Line Lowering 7) Bridge Mounting 7000 if 4 2 13 225 1~ 1 ls 1 Alternate #1 / Alternate #2 / 1 Aerial Crossing 160 if @ 1 Creek Lowering 200 if @ $42.00 $9000.00 $1200.00 $1700.00 $160.00 $20,000.00 $15,000.00 $280.00 $100.00 $294,000.00 $36,000.00 $2400.00. $22,100.00 $36,000.00 $20,000.00 $15,000.00 $425,500.00 $44,800.00 $20,O00.00 Denton Tap 1) 16" D.I.P. 3000 if 2) 16" Gate Valve w/bypass 3 3) Fire Hydrant 5 4) Bridge Mounting 2 Alternate #1 / 1 Aerial Crossing 320 if @ $280.00 Alternate #2 / 1 Creek Lowering 400 if @ $100.00 $42.00 $9000.00 $1700.00 $15,000.00 TOTAL $126,000.00 $27,000.00 $850O.OO $30,000.00 $191,500.00 $89,600.00 $40,000.00 Magnolia 1) 12" D.I.P. 400 if 2) 12" Valve 2 $39.00 $1200.00 TOTAL $15,600.00 $2400.00 $18,000.00 GRAND TOTAL w/15% contingency $635,000.00 $730,250.00