Loading...
Vistas of C P2-LR 970109FUGRO-McCLELLAND (SOUTHWEST), INC. l 2880 Virgo Lane; Dallas, Texas 75229 Ph (214)484-8301; Fax (214) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: January 9, 1997 PROJECT: Vistas of Coppell 2A, Coppell, Texas Project No.: 0761-2148 CONTRACTOR: Gilco TICKET NO.: 3036621 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 64 PLANT/TRUCK: 3/734 CONCRETE TEMP. (°F): 64 MIX ID NUMBER: 38 TIME BATCHED: 1:24 pm AIR (%) (ASTM C-231) N/A TIME SAMPLED: 2:00 pm WATER ADDED (gal): 0 WEATHER CONDITION: Foggy SLUMP (inches) (ASTM C-'143) 1 1/2 LOCATION OF PLACEMENT: Paving: Crestview Drive, station 4+00 CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) VCT 5 7 01/07/97 125000 4422 3000/28 days VCT 6 28 01/28/97 VCT 7 28 01/28/97 VCT 8 Hold Specifications: Making & Curing: ASTM C-31 Testin~l Methods: ASTM C-143, ASTM C-39 REMARKS: Technician: Hal Patterson FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: (~ / . "~- SMH/rm Distribution: Centex Homes - Derek Earle Gilco Contracting Inc. - Dale Gilreath (lime, paving, streets) City of Coppell - Garreth Campbell