Loading...
Vista Ridge 1st P-CS 880728GINN, INC. CONSULTING ENGINEERS July 28, 1988 Mr. Alan D. Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Denton Creek Channel Improvements Dear Mr. Ratliff: I discussed the attached letter with Mr. Dannenbaum Engineers. Phil Deaton of Mr. Deaton informs that the first "check dams" were only earthen plugs used by the contractor to keep the channel dry during construction. The agreement with the Texas Water Commission was to monitor the situation and construct permanent "check dams', if required. Mr. Deaton assured us that they have been monitoring the situation. They will prepare the report as previously stated. Based on his observations to date, he believes that there probably will be a requirement for permanent "check dams" to ensure sufficient flows in Denton Creek. If you have any questions, please call our office. Sincere H. Wayn~ Gind, P.E. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900