Loading...
Vista Ridge 1st P-CS 880727 (2) The City With A Beautiful Future July 27, 1988 P.O. Box 478 Coppell, Texas 75019 214 - 462 - O022 Hr. Hichael Allen Univest Development Co, any 12770 Coit Road, Suite 1215 Dallas, Texas 75251 R~: Denton Creek Channel Improvements Dear Hr. Allen: In your July 12, 1988 letter, you indicated that a check dma "was to be built", "was removed" and that the City needs to set an answer fro~ the "District" about these matters. Our file copy of the Texas Water Comtssion order dated October 28, 1985, paragraph 14 on pages 3 and 4, (COPY ATTACHED) indicates the applicant proposing "To monitor flow conditions for approxt-mtely one year after co~pletion of the project to determine if installation of Weirs is necessary." From this statement it appears that a "check dam(s)" ~ay be installed after the Study/Report is mede within one year after "completion". According to the June 28, 1988, letter fro~ Phil Deaton to Wayne Ginn,(COPY ATTAC~ED) co~pletion was on April 8, 1988; thereby calling for the Study to be completed by April 8, 1989. At that time, it would be deter~ned whether a check dam(e) would be necessary. I hope ~his information clears up any concerns, e~c. If you have any other questions, please feel free to contact ~e. Sincere ly, / /'~ / Alan Ratliff City Manager RRD/ADR/lsg CHNL. ~ H~O1 j CCITT 4uno 28, 1988 Hr~ Yayne Gtnn Glnn, Inc. 17103 Preston Road Sutte I00 LB 118 Dallas, Texas 75248 RE: Denton County Levee Improvmenet District No. 1 In response to a request from Kevtn Petffer tn your office, the following ~s_u_.n~_rt.z_!s__.t.h? stat.us of c.ur_re.n.t s.t.ud.t, es.of Denton Creek being performd by uuflLo. ~,ounl~y i. lyee lll~rovlmn% UlSTrlCT NO.I. On _ _Oct?~er ~8, lggS~the Texas .Water Commission ("llg") approved the ?nsc~u~clOn o, e tic]mutton project on Denton Creek by the Denton County ~?e..~??~euent D~st~tct No.l ("Dtstrt~t'). -As m condition of the approve1, Lnm ms~r~c~ egree~ zo p~epare i w~ltten report which tmuld include an analysis o~ the effect, tf any, of the diversion of water between the natural Denton Creek channel and the proposed flood control channel and would propose remedial action, if uny, necessary to correct observed problems. The report would be submitted to the TWC one-y!ar after completion of the project. The District's reclmtton project was completed on Aprtl 8, 1988. As r~quired by the TeaC, t~e District is conducting a study of the effect, if any, of the diversion of water between the two channels. The results.of this study ~ be _Included_ _tn e re.porT..whl~h w!ll besubattted to tho TWC by April 8, ~uy. copies or the report Will mtso bo furnished to the City of Coppoll and Untvest DmYelopment Company. If I can be of further assistance in thls meter, please call. Sincerely, CC: Mr. Tom Tanner Mr. 4elf Hunt Hr. Jay Te,y ERING CORPORATION Phil .Dalton, P.E, P~oJect Manager 1733-0] 9. The proposed project will reclaim land within an area presently designated as #floodway# by the Federal Emer- gency Management Agency {FEMA). The proposed channel improve- ments will compensate for encroachment into.the floodway, and readjustment of the floodway limits according to FENA regu- lations will be justified. 10. The proposed project will allow reclamation of approximately 560 acres within the District, will benefit landowners south of Denton Creek and outside of the District in the upstream portion of the project area, and will not be detrimental to any landowners outside of the District. 11. The proposed project will allow sufficient ordinary flows to remain in the old channel of Denton Creek to sustain local fish and other population in the stream. Streamside vegetation will not be harmed and only a small amount of such vegetation within the District will be removed during con- struction. The proposed project will not promote the growth of mosquito population in the area. 12. Ordinary flows within Denton Creek are primarily affected by controlled releases from Lake Grapevine and ..... · --- ~-~m eh~ watershed between Lake Grapevine and monitor flow conditions for approximately one year after completion of the project to determine if installation of weirs is necessary. 15. The proposed project will not significantly increase the 100-year water surface levels within or upstream from the project area. 16. The Executive Director recommends approval of the engineering report as the District's Plan of Reclamation. 17. Construction of the project will commence within six months from the ~ate of issuance of this Order. 18. Completion of the project will occur within two years from the date of issuance of this Order. CONCLUSIONS OF LAW 1. Applicant seeks approval of its engineering report as its Plan of Reclamation under S57.156 of the Texas Water Co~____~e and 31T.A.C.S315.36. 2. Applicant seeks approval of preliminary plans under T.A.C. S~315.37, 916.236 of the Texas Water Code and 31 315.38, and 315.51-315.63. 3. The Commission has jurisdiction under Texas Wate~ Cod~ SS57.156 and 16.236 to consider the application and the proposal for Decision and to approve both the engineering report as a Plan of Reclamati°n and the project plans of the applicant. 4. -The plans are in Rules of the Texas Water Commission agency, the Texas Department of Water Resourcos, applicant's engineering report and prelhainary compliance with the T~s Water Co~e and the and of its predecessor and should be approved. NOW, ~RE, BE IT ORDERED SION THAT= I The engineering report submitted by Denton Levee Improvement District Ho. 1, Engineering Corporation and dated April