Vista Ridge 1st P-CS 880502DANNENBAUM ENGINEERING CORPORATION
7950 ELM~C)OK ORIVE, SUIIE 250 DALLAS, 1EXAS 75247 (214) 638-0145
May 2, 1988
Ms. Shohre Daneshmand
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Re: MacArthur Blvd. Extension Across Denton Creek
Dear Ms. Daneshmand:
As you requested in our recent meeting I am providing you with a drainage
area map for the proposed drainage facilities along the MacArthur Blvd.
extension across Denton Creek north of DeForest Lane. I have also inclosed
preliminary profiles of the proposed drainage structures.
At our meeting we also discussed the hydraulic studies prepared for the
City of Coppell by Anderson Engineers, Inc. Attached herewith for your review
is a copy of a letter I sent to Mr. Wayne Ginn concerning a problem I have
with the discharges used in the study.
If you have questions concerning this letter, please call.
PD:cr:0850PD
2201-01
Sincerely,
DANNENBAUM ENGINEERING CORPORATION
Phil Deaton, P.E.
Project Manager