Loading...
Vista Ridge 1st P-CS 871111DANNENBAUM ENGINEERING CORPORATION November ]1, ]98? Mr. Wayne Ginn Gi~n. Inc. Consulting Engineers 17103 Preston Road, Suite 100 Dallas, Texas /5248 Re: Denton Tap Road at Denton Creek Dear Wayne: As you are aware, we are currently preparing construction plans for the widening of the existing Denton -a; Road bridge across Denton CreeK. As a result of the recently adopted Coppell Flood Plain Ordinance, we have been reevaluating the hydraulic adequacy of the existing bridge. Our initial evaluation was based on information contained in the 1986 report titled Denton Creek Floodplain Study, prepared for the City of Coppell by Anderson Engineers. Inc. In this report it was recommended that design discharges be computed using the HEC-1 computer model assuming a fully developed watershed. The water surface profiles presented in the report were based on discharges computed using the HEC-1 model. The lO0-year water surface level immedia=ely upstream of Denton Tap Road, for a discharge of ]9.730 cfs. was shown to De elevation 458.58 (see Figure 2-5, 1986 report), which is approximately ~.4 feet below the existing low steel of the bridge. During our reevaluation I called Mr. Carl Anderson to be sure that the information contained in the 1986 reDort had not been revised. I was informed by Mr. Anderson that he had restudied the discharges on Denton Creek. He had determined that an analysis based on USGS gage records fo~ the gaging station at SH121 should be used to compute the lO0-year discharges along Denton Creek. With this type of analysis, the ]O0-year discharge increased from the i9,730 cfs value previously determined, to 27,430 cfs. The fOe-year water surface level (design base flooo~ upstream of the bridge increasec zo elevation 462.96. With the eleva~:cr,, [ne bridge would not have the required freeboard and woulo nave to be reziaced to meet the requirements of lrme new city ordinance. I have reviewed the methods used by Mr. Anderson to develop the higher discharges. The method utilized historic USGS gaged stream flows at SH 12l to predict discharges for specific ~e~uencies. The historic flows in Denton Creek have been regulated by a ;r~[,s of Engineers flood control reservoir, La~:e Grapevine. since ]952. ~ ~aged flows at SIJ 12] subsequent to 195Z Nayne Ginn November 1], ]987 Page two reflect the attenuating effect that the lake has on flows in the creek. Gaged flows prior to 1952 do not reflect the effect that the lake has on creek flows. In order to determine what flows would have occurred prior to ]952. if the lake had existed at that time, a routing through the lake would be required. This routing would undoubtedly show that the pre-1952 discharges at the gage would have been significantly less if the lake had been in place. It so happens that for the gage period 1948 through ]984 which was used by Mr. Anderson in his analysis, the highest, third highest, and fourth highest historical flows occurred prior to ]952. In his analysis, these flows were not modified to reflect the effect that Lake Grapevine would have on them. Use of the unmodified flows has resulted in an artificially high prediction of ]O0-year discharges. I believe that if the historic pre-J952 flows were modified to account for the effect of the lake, as they should be, the ]O0-year discharge would be significantly lower. This lower discharge would result in a lower lO0-year water surface profile in Denton Creek. The existing Denton Tap Road bridge would then have the required freeboard over this lowered profile. ' We hereby- request that the lO0-year discharges be recomputed using gage records modified to reflect the effect of Lake Grapevine, or that discharges based on the HEC-I model be adopted. We also request that new water surface profiles be computed using the revised discharges. We request your earliest assistance in resolving this matter We cannot continue with the design of the Denton Ta · · ' of the discharge and water s-~-~ , .... P.~o~d ~rldge until we are con ' our desinn ^ ......... ~ .... ~ ,~ve~s which the City w~ ...... [ld~nt call me i~ ]-- ~"y rev~seo lntormation should also be ~r~,.~]]] Y~ ,n reviewing ~uu nave any questions or wis~ *~ ~- [. -,u~u ~o FEMA. Please ,, ~v u,scuss thlS matter further PD:cr:O~055 2201-01 Sincerely. DA~ENBAUM ENGINEERING CORPORATION / i~' //~__j ~- ~, ,. ~, ~'~/ Phf] Deaton. P.E. Pro~ect ~anager cc: Mr. Tom Tanner