MacArthur Boulevard Exit to Vista Ridge Addition
Coppell, Texas
Dear Ms. Bowman & Commission:
As requested during the Planning and Zoning Commission meeting
on Thursday, January 15, 1987, we have been able to determine
the status of the Vista Ridge Development in Lewisville, and
more particularly the status of the Lewisville portion of
MacArthur Boulevard. The final plat and engineering plans were
approved by the Lewisville City Council on April 21, 1986. The
final plat was filed on September 15, 1986, at the Denton County
Courthouse in Cabinet F, Page 271 - 276.
Currently, all underground utility work has been constructed
within the road right-of-way, but the paving has not yet been
completed. The contract for the bridge crossing the Levee
District channel into Coppell has been awarded, but construction
is on hold pending Coppell's adoption of the proposed alignment.
In addition to the above, we have had the proposed MacArthur
alignment with the Moore Road connection shown reviewed by our
traffic engineer. From a traffic safety standpoint, he has no
problems with it, especially since the MacArthur Boulevard -
Moore Road intersection will probably be signalized and is
planned to be a "Tee" intersection with no East-West through
traffic. Our traffic engineer did, however, recommend that when
the corner tracts on either side of Moore Road at the
intersection come in for platting that sight easements (corner
clips) be dedicated by the developer to provide adequate sight
distance for southbound traffic on MacArthur.
I hope this information will be of help to you ,in formulating
your decision.
Sincerely,
PoEo
/ss
cc: Wayne Ginn
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900