Vistas of C P2-CS 970304 P.O. Box 478 ~
Coppell, Texas 7501'9,,
The City With A Beautiful Future 214-462-0022 ~
March 4, 199/
Derek Earle, P.E.
Centex Homes
1660 S. Stemmons, Suite 230
LewisviHe, TX 75067
CoppeH Phases 1A~d 2B Development Fees
Re:
Vistas
of
Dear Mr. Earle:
Included with this letter is a copy of the development fee table for Phases lA, 2A and 2B.
The fees have been adjusted in accordance with the Water, Sanitary Sewer and Alternative
Drainage Improvement Agreements approved by City Council on April 23, 1996. Those
agreements provide for a credit against future impact fees on the Vista Property in the
following amount: Water - $ 304,200; Sanitary Sewer - $ 75,150; and Alternative
Drainage Improvements (to be used to offset Roadway Impact Fees) - $145,000.
There are several guidelines on utilization of the credits. I am fully aware that Centex has
acquired Vista Properties. However, for tracking purposes, I would appreciate a letter
from Vista Properties assigning the aforementioned credits for water, sanitary sewer and
roadway impact fees to Centex. At that time, the "Bank" will be set up in the name of
Centex. Based on calculations performed by the City, the following represents the water,
sanitary sewer and roadway fees due for the various developments with the remaining
available credit.
Water Sanitary Roadway
Sewer
Phase lA $32,850 $29,250 $55,575
Phase 2A $7,200 $3,600 $6,840
Phase 2B $24,300 $24.300 $46,170
Total $64,350 $57,150 $108,585
Beginning Bank Credit $304,200 $75,150 $145,000
Remaining Available Credit $239,850 $18,000 $36,415
Concerning the Park Fee, it is my understanding that the Hike and Bike Trail will be
constructed by Centex with the development of the property. Therefore, those fees have
been removed from the Development Fee Table.
ff the above represents your understanding of the available credits, the utilization of those
credits and the balance of the "Bank" please indicate by letter form at your earliest
convenience.
If you should have any questions concerning this issue please feel free to contact thig office
at your convenience.
Sincerely,
Kenneth M. Griff'm, P.E.
Director of Engineering and Public Works
DEVELOPMENT FEE TAB
Project: Vistas of Coppell, Phase 2A
Date: 2/28/9 7
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee ($7,200.00) $0.00 $o per 4/23/96
(100 % due prior to Council Approval) Agreement
Water Tap Inspection Fee $450.00
(100 % due at Issuance of Water Meter)
Water Meter Fee (Domestic) $185.68
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $240.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee ($3,600.00) $0.00 S0 per 4/23/96
(100% due prior to Council Approval) Agreement
Wastewater Tap Inspection Fee $400.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $400.00
(100% due at Issuance of Building Permit)
Park Fee ($10,280.00) $0.00 $0 Will Build
(100 % due prior to Council Approval) Hike/Bike Trail
Roadway Impact Fee ($6,840.00) $0.00 $0 per 4/23/96
(100% due prior to Council Approval) Agreement
Street Light Fee Information not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $1,906.66
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
DEVELOPMENT FEE WORKSH
PROJECT: Vistas of Coppell, Phase 2A
DATE: 2/28/97
Water Impact Fee:
Domestic Meter(s): 8 - 5/8 inch X 3/4 inch = 8 ESU's
Irrigation Meter(s): 1 - 2 inch = 8 ESU's
= ESU's
Fireline Meter(s): 0 - N/A = ESU's
Total #: 18 ESU's @ $450.00 ea. $7,200.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 9 Connections @ $50.00 ea. $450.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 8 Domestic Meter(s) @ $23.21 $185.68
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: I Irrigation Meter{s) @ $195.98 $195.98
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter{s) @ $0.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 8 Meter(s) @ $30.00 ea. $240.00
{100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: I Meter(s) @ $35.00 ea. $35.00
(100% due prior to issuance of water meters)
Wastewater [mpact Fee:
Total Domestic Meters ESU' 8 @ $450.00 ea. $3,600.00
Wastewater Tap-Inspection Fee:
Total #: 8 Connections @ $50.00 ea. $400.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 8 Lots @ $50.00 ea. $400.00
{100% due prior to issuance of building permit)
Page I
DEVELOPMENT FEE WORKSH
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
8 Single-family @ $1285.00 / Lot $10,280.00
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $6,840.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
{100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
{See attached fee calculations if applicable)
Construction, Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADffAY IMPACT FEE CALC NS
PROJECT: V'utas of Coppell, Phase 2A
DATE: 2/28/97
ROADWAY IMPACT FEE:
~ervice Area * 2
Category ** Residential
Land Use ** Sinile-Family Detached
Buildin~ Size (Sq. Ft.) N/A
Development Units ** 8
Vehicle Miles per Development Unit ** 2.85
Fee Hr Vehicle Mile *** ., $300
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $6,840.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
DEVELOPMENT FEES
IIPROJECT NAME: Vistas of Coppell, Phase 2A II
IENGINEER: Carter & Burgess
IREVISION DATE: 3/12/97
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
3/4/97 Park Fee ($10,280.00)
3/4/97 Water Impact Fee $7,200.00 $7,200.00 * See Note
3/4/97 Wastewater Impact Fee $3,600.00 $3,600.00 * See Note
Street Sign
Street Light notify street dept.
Construction Inspection $5,091.77 $5,091.77 11/19/96
3/4/97 Roadway Impact-Zone 2 $6,840.00 $6,840.00 * See Note
Street Cut Permit
1/6/97 Overtime Inspection(1/4) $60.00 $60.00 1/9/97
1/20/97 Overtime Inspection(1/18) $90.00
* notify and copy to Linda Hayes & Utilities Dept. all deposit fees paid or meters sold
Total Fees Fees Paid Amount Owed
TOTALS $22,881.77 $22,791.77 $90.00
NOTES
* Paid per Agreement approved by City Council 4/23/96. (See letter 3/4/97)
Prior To Construction Prior To Final Acceptance
Erosion Control Approved As Built Plan Recd.
E.P.A.-N.O.I. Recd. Paving Bond Recd.
Const. Plan Approved Utilities Bond Recd.
Irrigation Plan Recd. Irrigation Plan Approved
Erosion Control Maint.