Vistas of C P2-CS 970715 Carter- -Burgess Consultants in Engineering, Architecture, Planning and the Environment July 15, 1997 i)7-18-97 ~0$:~z6 IN Mr. Mike Martin City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Reference: Vistas of Coppell, Phase lB and 2C Construction Plan comments Dear Mike: We have received your comments for the referenced project and have addressed your comments except as follows: Phase lB Drainage & Utilities 2. We are in the process of getting a grade to drain permission letter from Vista Properties. This open channel would be maintained by the city while it is open. When the site north of ours is developed this flow could be enclosed. 6. Due to the Iow exit velocity from this system, baffles will not be beneficial and, therefore, were not added. ~hase 2C Drainage & Utilities ~..l'~s, We did not provide additional ties to the 12-inch line in Vista Ridge Blvd. because '". there is more than adequate looping of water lines for this subdivision. 12, Due to the Iow exit velocity and since rock rip rap will additionally slow the ':;discharge down, baffles will not be beneficial and, therefore, were not added. ~,713. We have considered extending the pipe and in order to prevent blockage of flow frO'm upstream and to avoid mass destruction of trees in the creek, such extension was:deemed unwarranted. Also, in order to revise side slopes to 4:1, many more trees would have to be removed and our pad on Lot 17 would not fit, therefore, it remains at 3:1. 15. There never has been an easement filed for the existing drainage system according to our title search. Coder & Burgess, I.¢, 7950 Elmbrook Suite 250 Dallas, Texas 75247-4951 (214) 638-0145 Metro (214) 263-2019 Fax (214) 638-0447 Mr. Mike Martin July 15, 1997 Page 2 16. The developer is willing to remove the existing storm pipe where it is beneath a future home site but feels that removing the other portions is unnecessary and costly due to the depth of the line. 18. Because fill is being placed on top of the apron will have added a note to remove it entirely. Phase 2C Paving 3. Details have been added which match the Phase 2B and lA plans. Enclosed are a set of plans for each phase. If you have any questions, please call. Sincerely, CARTER & BURGESS, INC. Terry W. Mitchell, P.E. Associate Principal TM/ctm 95234602.L02 cc: Mr. Derek Earle