Loading...
Vistas of C P2-CS 970828 ' Coppell, Texas 75019 ~ ~ he City With A Beautiful Future ~ 214-462-0022 August 28, 1997 Terry Mitchell, P.E. Carter Burgess Engineering 7950 Elmbrook Drive suite 250 Dallas, TX 75247-4951 RE: Visas of Coppell Phase 2C Dear Mr. Mitchell: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: Storm Drainage & Utilities Plan 1. The water lines in the cul-de-sac adjacent to Visa Ridge Blvd. need to be extended and connected to 12" water line on Visa Ridge Blvd. Paving & Grading Plan 1. Slopes adjacent to alley "C" and at the ends of the cul-de-sac, appears to be steep therefore requiring retaining walls to be constructed outside of the right-of-way. 2. Provide proposed grades on the south side of Waterview Drive near the west end of the cul-de- sac adjacent to the common area. 3. The typical street section for Visa Ridge Blvd. with the deceleration lane shows a 4:1 slope behind the curb. How will the 5' sidewalk be constructed in this area? 4. Provide a note sating alley pavement to be warped toward inlet (see sheet 11 of 13). 5. The existing drainage ditch adjacent to Lot 17, Block D will possibly need additional permanent erosion control. 6. The proposed slopes adjacent to Visa Ridge Blvd. appear to be steep therefore retaining walls may be required, to be constructed outside of the right-of-way. 7. Show the high and low points on all the pavmg plan views. There are various other minor comments throughout the plans. Once these comments have been addressed, the marked up plans along with two revised sets of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please c6ntact me at 304-3681. Sincerely Michael A. Martin, P.E. Assistant City Engineer