Loading...
Town Center L4B1-LR011126 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 10 Concrete Compression Test Dallas, Texas 75229 --t, LDe"or* (972) 620-8911 Tested For: CONSTRUCTION MANAGEMENT GROUP Our Report No.: 01612-39 ATTN: MR. JEFF MILLER Issue Date: 11/26/2001 5207 MCKINNEY AVENUE, SUITE 12 DALLAS, TX 75205 Fax Num~~~~l~l~~ ~ FIELD DA TA Placement Location: SEE NOTES Date Placed: 11/9101 Plant Number: 88-4000 Tim® Placed: 10:07 AM Delivery Ticket No.: 88003897 Slump (ASTM C-143): 3.75 Made By: ALPHA Air Content: 5.25 (ASTM C-173) Cured Specification: ASTM C-31 Air Temperature: 51 Specimen Temperature: 70 /.., / ~ Date Received: 11/10101 K~ Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: TIMMONS, SCOTT Mix Data Submitted By: BEALL CYLINDER COMPRESSION TEST RESUL TS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: T~pe: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: 64 LAB C-1231 11/16/01 7 12 N/A 6 28.27 139120 65 LAB 12/7/01 28 12 N/A 6 28.27 0 66 LAB 12/7/01 28 12 N/A 6 28.27 0 67 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3600 I Results to Date: N/AI Notes: DECELERATION LANE ON DENTON TOP RD., 150'E & 25'N FROM THE SI: COENEE OF THE BUILDING. CC: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP Respectfully Submitted By: of Alpha Testing, Inc. Our test results and repons a.re for the exclusive use of the Client (and their deslBnated receplents on file in our office) and shall not be reproduced and/or distributed except . ~ express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not Indicative of the qualifies of apparenfiy Identical or similar specimens. -III1~ ~¥ I1 [ .... :-- . I ...... ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 10 ompress,on Dallas, Texas 75229 Oe"or* (972) 620-8911 Tested For: CONSTRUCTION MANAGEMENT GROUP Our Report No.: 01612-32 ATTN: MR. JEFF MILLER Issue Date: 11/26/2001 5207 MCKINNEY AVENUE, SUITE 12 DALLAS, TX 75205 Fax Number: (214) 521-1279 Project Dose: COPPELL TOWN CENTER 120 N. DENTON TAPP- COPPELL, TX FIELD DA TA Placement Location: PAVING; PARKING LOT, 20'E & 5'N FROM THE SE CORNER OF THE BUILDING Date Placed: 10117/01 Plant Number: 89-4000 Time Placed: 12:35 PM Delivery Ticket No.: 89003561 Slump (ASTM C-143): 5 Made B~ ALPHA Air Content: 4 (ASTM C-173) Air Temperature: 75 Cured Speciflcetlon: ASTM C-31 Specimen Temperature: 77 Date Received: 10/18/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: MAGALLON, E. Mix Date Submitted By:. BEALL CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age . Avg- Avg. Avg Depth/ Area: Max~ IPSl: No.: T)~pe: Spec: Tested: (Dey~): Len~h Width Diameter Sq. In. Load: 37 LAB C-1231 10/24/01 7 12 N/A 6 28.27 81600 2880 38 LAB C-1231 11/14/01 28 12 N/A 6 28.27 112370 3970 39 LAB C-1231 11/14/01 28 12 NIA 6 28.27 116770 ~ 40 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3600 Results to Date: PASS Notes: CC: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP Respectfully Submitted By: //~.. ~ ....'~ of Alpha Testing, Inc. Our te~t results and repor~ are for the exdudve ~e of I tbelr dedinated receplenl~ on file In our oflfi:e) and shall not be reproduced and/or dbl]tbutod except with expre~ approval of AI.PHA. The u~e of our name and te~t re~l~ must receive our written approval. Te~t re~ul~ and report~ apply o. ly to the ~amples te~ted and/or observed, and are not Indicative of the qualities of apparently Identical or sim#ar spedmeas. I1~ --'- '