Loading...
Town Center L4B1-LR011116 ALPHA TESTING, INC. Concrete Test .2209 Wisconsin St., Suite 100 ~omeress,on Dallas, Texas 75229 (972) 620-8911 Tested For: CONSTRUCTION MANAGEMENT GROUP Our Report No.: 01612-33 A'I-rN: MR. JEFF MILLER Issue Date: 11/16/2001 5207 MCKINNEY AVENUE, SUITE 12 DALLAS, TX 75205 Fax Number: (214) 521-1279 Project Desc: COPPELL TOWN CENTER 120 N. DENTON TAPP-- COPPELL, TX FIELD DA TA Placement Location: SEE NOTES Date Placed: 10/17/01 Plant Number: 89-4000 Time Placed: 3:05 PM Delivery Ticket No.: 89003583 Slump (ASTM C-143): 4.5 Made By:. ALPHA Air Content: 5 (ASTM C-173) Cured Specification: ASTM C-31 Air Temperature: 76 Specimen Temperature: 78 Date Received: 10/18/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted B~ MAGALLON, E. Mix Data Submlttad By: BEALL CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: MlUd'~-~" No.: Type: spec: Tested: IDa~l: Len~h Width Diameter Scl. In. Loll 42 43 LAB C-1231 11/14/01 28 12 N/A 6 2-'~.27 129312 , 4570 ~g 44 LAB HOLD HOLD 12 N/A 6 Specifications: 28 3600 Results to Date: PASS Note~: PAVING; PARKING LOT, 15~N & t0'G FROM THE ~E INTER~ECTION OF TOWN CENTER ~T. & PARKING LOT cc: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP Respectfully Submitted By: ~~ _ of Alpha Testihg, Inc. Our test resull~ and reports are for the exclusive use of the (and their designated recepients/' on file in our office) and shall not be reproduced and/or dbMbuted except writ expres approval of*ALPHA. The use of our name and test results must receive our written approval. Test results and repor~ apply only to the samples tested and/or observed, and are not Indicative of the qualities of apparently Identical or dmllar specimens. ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 100 ,_,omt, ress,on Dallas, Texas 75229 x~, ~ ~,~enor~ (972) 620-8911 Tested For: CONSTRUCTION MANAGEMENT GROUP Our Report No.: 01612-31 ATTN: MR. JEFF MILLER Issue Date: 11/16/2001 5207 MCKINNEY AVENUE, SUITE 12 DALLAS, TX 75205 Fax Number: (214) 521-1279 Project Desc: COPPELL TOWN CENTER 120 N. DENTON TAPP-- COPPELL, TX FIELD DA TA Placement Location: PAVING; PARKING LOT, 20'S & 15'E FROM THE NE CORNER OF THE BUILDING Date Placed: 10/17/01 Plant Number: -4000 Time Placed: 7:15 AM Delivery Ticket No.: 102569 Slump (ASTM C-143): 5 Made By:. ALPHA /tlr Content: 4.5 (ASTM C-173) Cured Specification: ASTM C-31 Nr Temperature: 69 Specimen Temperature: 71 Date Recalved: 10/18/01 Delivery Method: PICKED UP BY ALPHA Field Date Submitted By: MAGALLON, E. Mix Date Submitted By: NELSON BROS. CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: 'l~e: Spec: Te~ted: IDa~l: Len~h Width Diameter Sq. In. Load: PSI: 33 LAB C-1231 10/24/01 7 12 N/A 6 28.27 100700 t3560 34 LAB C-1231 11114/01 28 12 N/A 6 28.27 117590 ~150. / 35 LAB C- 1231 11/14/01 28 12 N/A 6 28.27 118220 36 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3600 Requite to Date: PASS Notes: CC: HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP  ee~uS~l~a ully Submitted By: of Alpha Testing, Inc. with expre~ approval of ALPHA. The use of our name and test resu~ must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not Indicative of the qualitb~ of apparently idendcal or dmilar specimens.