Loading...
ST9801-CS000727 (2)COPPELL, TEXAS 75019 Robert Weber Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Coppell Road Project # ST 98-01 Overtime Inspection Fees Dear Mr. Weber: P.O. Box 478 Coppell, Texas 75019 972-462-0022 July 27, 2000 Upon review of the contract between the City of Coppell and Ed Bell Construction Company for the referenced project the payment for overtime inspection services on Saturdays was not addressed. Therefore, this letter is to inform you that all requests for payment of overtime inspection service from the beginning of the project will be rescinded. However in the future, for the City to provide inspection service on Saturdays proper notification must be made. The City's policy regarding Saturday inspection service requires the contractor to notify the City no later than noon on the Wednesday before the requested Saturday work. The request to work may be withdrawn prior to 3:00 p.m. the Friday preceding the scheduled Saturday workday. Recently, Larry Davis was notified that Ed Bell Construction Company would work on Saturday July 22, 2000 pouring concrete paving. Larry Davis was on the job to provide inspection services on that date, as requested, but was told no work would be done because concrete trucks were not available. In the future, if Ed Bell Construction Company requests inspection service be provided on a Saturday and then does not perform work, the City will charge your company a minimum of 4 hours for the inspection fee. If you have any questions concerning this issue please feel free to contact me at 972/304-3679. Sincerely, Mi~ha~e A. Martin, P.E. Assistant City Engineer cc: Finance Deparmaent Larry Davis, Construction Impector FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 July 27, 2000 Mr. Larry Davis Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Larry: It is our intent to fine grade and tie steel for concrete paving on Coppell Road on July 29, 2000. As a result, we request that we be permitted to work on July 29, 2000 and that the appropriate level of inspection be available on that day. If you have any questions regarding this request, don't hesitate to contact our office. Sincerely, 2~22~C~st ~- tion Company 2 Robert D. Weber Project Engineer AN EQUAL OPPORTUNITY EMPLOYER