Vistas of C P2-CS 971125 (3) -- P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
November 25, 1997
Kenny Hafner
Centex Homes
2800 Surveyor Blvd
Carrollton, TX 75006
RE: Street Light Fee Assessment / Vistas of Coppell, Phase 2B
Dear Mr. Hafner:
The following assessment represents the number of light units as established by TU Electric for
Vistas of Coppell Phase 2B.
9 lights @ $292.60 per light -- $2,633.40
Prior to the f'mal acceptance of this project, a check in the amount of $2,633.40 should be made
payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with
a copy of the street light fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment
of the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely
Kennk'Teth M. Griffin, P.E.
Director of Engineering and Public Works
cc: Jennifer Armstrong, Finance Director
Matt Cast, Supt. Public Services
Greg Jones, Building Official
Doug Stevens, Engineering Technician
AGREEMENT FOR STREET LIGHTING SE CE SUPPLEMENT
NUMBER
City of ~oppell , Texas ("City") and TEXAS
UTILITIES ELECTRIC COMPANY ("COMPANY"), and ("Developer" if applicable)
City _re~luests and au. thor.izes Company _to provide street lighting activity as follows below and on sketch(s)
attached hereto ann mane a part hereof.
~ctions: Addition r Removal Vistas of Coppell, Phase 2B Addition
Action Quantity Wattage Light Source Rate Scheduled Identifying Location (Addre~, etc.)
Group Luminaire/Pole Type (See Attached Sketch)
A I 100 HPS A Acorn/11' American Crestwood Drive
~ Rockcrest Drive
A 1 100 HPS A Acom/l !' American Cresthaven Road
~ Rockcrest Drive
A 1 100 HPS A Acorn/11' American Cresthaven Road
Lot 36 Block "E"
A I 100 HPS A Acorn/l 1' American Cresthaven Road
Lot 33 Block "E"
A I 100 HPS A AconVl 1' American Cresthaven Road
Cul-de-sac
A I 100 I HPS A Acorn/11' American Waterview Drive
Lot I Block "D'
A I 100 HPS A Acorn/11' American i Waterview Drive
I ~ [ Lot 3 Block "D"
A I 100 I HPS A
Acorn/l
1'
American
Waterview
Drive
, Lot 6 Block "D"
A I 100 HPS A Acorn/11' American Waterview Drive
Lot 9 Block "D"
i ,,
i
Under these additional conditions (ff any)
EXFHRIT A
(CONTINUED ON BACK)
TSN 319107 4 - 21 - 94
1. City or Developer agrees to pay Company $ in consideration of Company's agreement to install said street
lights and understands that no construction work will begin until after Company has received full payment.
2. Company agrees to install, own, operate and maintain said street lights in accordance with its street lighting agreement with
customer. However, if City or Developer falls to pay, on demand, the amount indicated above, this supplemental agreement is
automatically terminated.
3. All parties agree that Company will retain for its use and benefits the payment received hereunder in consideration of its
obligation to install said street lights and that Company at ali times has rifle to, and complete ownership and control of, said
street lights.
4. Company is not liable for loss or injury caused by delay or failure to install the electric facilities necessary to serve customer
because of delay in receiving shipments of required material, orders or formal requests of governmental agencies, acts of God
or the public enemy, inevitable accidents, fire, explosions, strikes, riots, war, or any other causes reasonably beyond control of
Company. If Company is prevented from installing such electric facilities by any of the above causes, Company agrees to
return to City or Developer, without interest, the entire amount of City or Developer's payment, thereby terminating this
supplement and Company's obligation to provide the electric facilities described herein.
5. This agreement is entered into subject to the terms of the Agreement for Street Lighting Service between City and
Company dated
ACCEPTED BY COMPANY ACCEPTED BY CITY ACCEPTED BY DEVELOPEi~ (If applicable)
· SIGNATURE
Engineering Analyst Senior
DATE SIGNED DATE SIGNED O ' DATE SIGNED
April 18, 1997