Loading...
ST9801-CS000720 (2)Sent By: ED BELL FAx ~'2U) CONSTR C0; 2812326300 2812326300; Jul-2"~0 12:35; Page 1/1 TELEPHONE (214] 388-6581 July 20, 2000 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX ~i401lll 10605 HARRY HINES DALLA6, TEXA6 76364,0767 DALLAS. TE,v,A$ 75220 Via Fax .972-304-3§ 70 Ken Griffin, P.E. CITY OF COPPELL City of Coppetl Town Center 255 Parkway Boulevard P.O. Box 478 Coppell, TX 75019 Coppoll Road Project # ST 98-01 EBCC # 946 Dear Mr. Griffin; We have received your Change Order No. 3 dated July 18, 2000, for the addition of 440 square yards or Grouted Rock Rip at the contract unit price. Our subcontractor for that item, Humphrey & Morton, has informed us that the contract unit price will not be acceptable for that item. The nature of the work you have a coreract unit pricc for is significantly different than the work contemplated by this change. The changed work is an isolated area, with poor access, and L,'emendous risk of damage to the existing driveway and irrigation system. With those items in mind, our price for this work would be $61.90/SY, or a total of $27,236.00. Additionally, they have i~brmcd us that they will complete the balance of their work within l0 days and are not in a position to work this into their schedule in the near future. Please notify us of your intent within this time I~'ame so that they may plan their work. If you need further intbrmation, please do not hesitate to contact me at 281-232-2355. Sin. Vice IELL ~T!ON T P~ ;sident COMPANY AN EQUAL OPPORTUNITY EMF'LOYER .... · ..................· ............r1T ....................T ........................ CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Copper Road Reconstruction Project tt ST98-01 CONTRACTOR: Ed Bell Construction OWNER: City of Copper CHANGE ORDER NO.: 3 DATE: 7/1~ Item Description Drainage Channel Revisions ADD: Quantity unit Price Total New 12" Grouted Rock Rip-rap Total Revision to Contract Amount SY 38.00 $16,720.00 $16,720.00 Previous contract amount Net increase in contract amount Revised contract amount Net increase in contract time of ~ Revised Contract time $2,028,660.31 $16,720.00 $2,045,380.31 Calendar Days Calendar Days The contractor hereby and satisfaction of all past revision to the Contract. this Contract adjustment as a final and complete adjustment in full accord future liability originating under any clause in the Contract by mason of this Recommended Engineer Date Agreed to Date Accepted by Owner Date