Vistas of C P2-CS000425 P.O. I~x ,I.78
C_~, TX 75019
Pl~",e: (9/2)304-367~
Fax: (972)304-3570
ENGINEERING DEPARTMENT
FAX COVER SHEET
(including cover sheet)
[] Urgent [] For Review I-I Please Comment [] Please Reply
IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CAt I. (972) 304-3679
Enghun~ring - Excellence By De~',~
DEVELOPMENT FEE TABLE
Project: Vistas of Coppell Phase 2B-Addendum for Irr. Meter
Date: 04/25/2000
TOTAL
FEES DUE
Water Impact Fee $450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100 % due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $25.67
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00
(100 % due prior to Council Approval)
Street Light Fee Info N/A
(100% due prior to Acceptance of Project
Street Sign Fee Info N/A
(100 % due prior to Acceptance of Project
Construction Inspection Fee Info N/A
TOTAL $555.67
DEVELOPMENT FEE WORKSHEET
PROJECT: Vistas of Co£pell Phase 2B-Addendutn for Irr. Meter
DATE: 04/25/2000
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
1 - 5/8 inch X 3/4 inch = 1 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 1 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $25.67
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$450.00
$50.00
$o.oo
$25.67
$o.oo
$o.oo
$o.oo
$30.00
$0.00
$0.00
$0.00
Page 1
P.O. aex 478
255 Pa~way Bird
~, TX 75019
Phone: (972)304-3679
Fax: (972)304-3570
ENGINEERING DEPARTMENT
FAX CO VER SHEET
(including cover sheet)
D U~ent [] For Review ri Plme Gomment
[] ~ Reply
IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679
Engineering- Excellence By Design
DEVELOPMENT FEE TABLE
Project: Vistas of Coppell Phase 2C-Addendum for lrr. Meter
Date: 04/25/2000
TOTAL
FEES DUE
Water Impact Fee $450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $25.67
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee Info N/A
(100% due prior to Acceptance of Project
Street Sign Fee Info N/A
(100% due prior to Acceptance of Project
Construction Inspection Fee Info N/A
TOTAL $555.67
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Vistas of Coppell Phase 2C-Addendum for Irr. Meter
04/25/2000
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
1 - 5/8 inch X 3/4 inch = 1 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 1 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$25.67
$0.00
$o.oo
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$450.00
$50.00
$0.00
$25.67
$0.00
$0.00
'$o.oo-
$30.00
$0.00
$0.00
$0.00
Page 1