Loading...
Vistas of C P2-CS000425 P.O. I~x ,I.78 C_~, TX 75019 Pl~",e: (9/2)304-367~ Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX COVER SHEET (including cover sheet) [] Urgent [] For Review I-I Please Comment [] Please Reply IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CAt I. (972) 304-3679 Enghun~ring - Excellence By De~',~ DEVELOPMENT FEE TABLE Project: Vistas of Coppell Phase 2B-Addendum for Irr. Meter Date: 04/25/2000 TOTAL FEES DUE Water Impact Fee $450.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $25.67 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100 % due prior to Council Approval) Street Light Fee Info N/A (100% due prior to Acceptance of Project Street Sign Fee Info N/A (100 % due prior to Acceptance of Project Construction Inspection Fee Info N/A TOTAL $555.67 DEVELOPMENT FEE WORKSHEET PROJECT: Vistas of Co£pell Phase 2B-Addendutn for Irr. Meter DATE: 04/25/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 5/8 inch X 3/4 inch = 1 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 1 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $25.67 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $450.00 $50.00 $o.oo $25.67 $o.oo $o.oo $o.oo $30.00 $0.00 $0.00 $0.00 Page 1 P.O. aex 478 255 Pa~way Bird ~, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET (including cover sheet) D U~ent [] For Review ri Plme Gomment [] ~ Reply IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679 Engineering- Excellence By Design DEVELOPMENT FEE TABLE Project: Vistas of Coppell Phase 2C-Addendum for lrr. Meter Date: 04/25/2000 TOTAL FEES DUE Water Impact Fee $450.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $25.67 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee Info N/A (100% due prior to Acceptance of Project Street Sign Fee Info N/A (100% due prior to Acceptance of Project Construction Inspection Fee Info N/A TOTAL $555.67 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Vistas of Coppell Phase 2C-Addendum for Irr. Meter 04/25/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 5/8 inch X 3/4 inch = 1 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 1 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $25.67 $0.00 $o.oo Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $450.00 $50.00 $0.00 $25.67 $0.00 $0.00 '$o.oo- $30.00 $0.00 $0.00 $0.00 Page 1