Loading...
CF-Coppell Rd SC-CS001027 COPi:'-ELL Planning Dopartmont 255 Parkway Goppoll, 'l'oxas 750'10 Phono: 072-304-3678 Fax: 072-304-7002 PROJECT(S): PD 108R5 and Minor Plat Coppell Service Center PLANNING DEPARTMENT CONTACT: Marcie Diamond DIRECT DIAL: 972-304-3676 FAX COVER SHEET DATE: October 27, 2000 PAGES:~=~._(including cover) TO: Ted Armstrong FAX: 972-458-2323 Cc: Sheri Moino Brad Reid *NOTE* THE DRC MEETING WILL BE IN THE 2ND FLOOR CONFERENCE ROOM OF CITY HALL Items Transmitted: 1. Agenda for the November 2, 2000 DRC Meeting 2. DRC Comments from the following departments: · Planning o Engineering · Leisure Services · Utilities Comments from Building Inspection and Fire Administration have not been received, and will be forwarded, if applicable. Remarks: Please revise plans based on Staff Recommendations. Bring two sets of revised plans to the Development Review Committee Meeting. If you have any questions or would like additional information, please contact me at 972-304-3676 or mdiamond(~.ci.coppell.tx.us AGENDA City of Coppell DEVELOPMENT REVIEW COMMITTEE November 2, 2000 NOTE: DURING THE MONTHS OF OCTOBER, NOVEMBER, & DECEMBER, DRC MEETINGS WILL BE HELD IN THE 2~° FLOOR CONFERENCE ROOM. l:30p.m. PD-189R, Hooptown, zoning change request fi.om PD-189 (Planned Development- 189) to PD- 189R (Planned Development- 189R) to allow the enlargement of the lot area for the construction of an indoor basketball/recreation facility on approximately 17.735 acres of property located along the north side of Belt Line Road, east of the intersection of Belt Line and Denton Tap Roads, at the request ofHooptown, LLC. 1:45 p.m. Hooptown, Lots 1 & 2, Block A, Preliminary Plat, to allow the enlargement of the lot area for the development of an indoor basketball/recreation facility on approximately 27.063 acres of property located along the north side of Belt line Road, east of the intersection of Belt Line and Denton Tap Roads, at the request ofHooptown, LLC. 2:00 p.m. U-Haul International, Site Plan, to allow the construction of a three-story mini-storage facility on approximately 2.02 acres of property located along the south side of S.H. 121, east of Denton Tap Road, at the request of U-Haul International. 2:15 p.m. Everybody Fits, Replat and Site Plan Amendment for Lot 2R, Block A of Denton Tap Development, to amend and expand the existing Site Plan to allow for additional parking for an indoor sports/recreation center on approximately 3.799 acres of property located on North Texas Court, west of N. Denton Tap Road, at the request of Everybody Fits, L.P. 2:30 p.m. City Centre Addition, Lot 1, Block A, Minor Plat and Site Plan, to allow the development of a 4,884 square foot shopping center on approximately 0.842 of an acre of property located along the west side of Denton Tap Road, north of Town Center Drive, at the request of Wainscott & Associates. 2:45 p.m. Can-ick Addition, Lots I & 2, Block A, Minor Plat, to allow the subdivision of approximately 0.70 of an acre of property into two lots allowing for the development of a single-family home on Lot 2 located at the northwest comer of Lodge and Sandy Lake Roads, at the request of Rory N. Carrick. Page 1 of I 3:00 p.m. Business Park, to allow a 154,000 square foot addition to the existing Haverty's facility located on approximately 26.45 acres of property west of Exchange Circle, north of Gateway Boulevard, at the request of Hal fl & Associates. 3:15 p.m. _PD-108R5, Coppell Service Cente_,, zoning change request from PD-108 (Planned Development. 108) to PD- 108-R5 (Planned Development_ 108- RS) to allow the development of a municipal service center on approximately 6.294 acres of property located 300 feet east of Coppell Road, south of Bethel Road, at the request of the City of Coppell. 3:30p.m. ~er. Lot 1 Block 1 Prelim/n Plat, to allow the development of a municipal service center on approximately 6.294 acres of property located 300 feet east of Coppell Road, south of Bethel Road, at the request of the City of Coppell. Page 2 of 1 City of Coppell Development Review Committee Comments Planning Department PD 108R5 Coppell Service Center West of Coppell Road, north of the D.A.R.T.R.O.W. DRC Date: October 26th and November 2, 2000 Planning & Zoning Commission Meeting: November 16, 2000 City Council Meeting: December 12, 2000 Sheet AO. 1 - Site Plan 1. Entire Fire Lane needs to be concrete, the portion in front of the building appears to be rendered as asphalt. 2. Need to add number of parking spaces provided in a tabular form, it appears that 114 parking spaces are being provided. 3. Dimension length and width of parking spaces, 9' x 19' is required. 4. Per Section 34-1-8 B.3 of the Zoning Ordinance, planting islands within a single row of parking shall be separated by no more than fifteen (15) spaces_, and by no less than five (5) parking spaces. However, on November 14, 2000 the City Council will consider an amendment to this ordinance, which will eliminate the "less than 5 parking space" requirement. 5. Label square footage of service center on Site Plan 6. Define the intended use for the service stacking and storage stacking areas 7. Need to indicate location of Burns Street right-of-way on the site plan. 8. Open storage is proposed adjacent to east, north and south property lines: · Per Section 33-1.5 of the Zoning Ordinance, where open storage is permitted, a six foot high screening wall shall be provided and maintained parallel to the property line adjacent to the area being screened. · Need elevation, proposed colors and materials of proposed screening walls. · Per Section 34-1-8 (C) of the Zoning Ordinance a 10 foot buffer is required adjacent to all property lines, there is no buffer indicated adjacent to the east property line. (see Landscape Plan Comments for additional requirements). · Per Section 25-1.12, the LI District regulations limit the amount of land devoted to outside storage to 20%. Section 25-7 further states that open storage shall be screened (see above) and shall be confined to the rear 2/3 of the lot. · Provide a calculation of the percentage of the lot devoted to open storage. These variances to the regulations of the Zoning Ordinance may be specifically addressed through PD Conditions. 8. Compete the words "PROPERTY LINE" in the Legend of Symbols. Page 1 of 3 Sheet L1.0 Landscaping Plan 1. Place property dimensions on the Landscape Plan. 2. The site area on the Landscape Plan and the Plat do not match. Rectify the differences. 3. The existing zoning is PD 108 - LI 4. Label the Landscape Plans with Common Names not Genus and Species. Verify that all proposed plant materials are on the City of Coppell's Plant Palette. 5. All trees need to be a minimum of 3 inch caliper, measured 12 inches above the ground and a minimum of 7 feet in height. 6. Perimeter Landscaping: Ten feet of landscaping is required along all property lines (frontage on Coppell Road, 15' is required and provided), and one tree is required per 50 linear feet. It appears that Austrian Pines are being used for a landscape screening devise adjacent to the open storage areas on the north and south property lines, however, the Ordinance requirements are as follows: · North Property Line: 10 trees are required, and 29 are shown. Austrian Pines could qualify as trees, if 3" caliper and 7 feet in height verses 6 feet as shown. · East Property line: 11 trees are required (within a 10 foot buffer), none are shown. · South Property Line: 10 trees are required, 25 are shown. Austrian Pines qualify as trees, if 3" caliper and 7 feet in height verses 6 feet as shown. · West property line: the 25 foot driveway width may be deleted fi.om the linear footage, therefore, 10 trees are required, and 13 trees are shown. Two options are available: (1) redistribute and reduce the number of trees, and increase the size of the Austrian Pines and correct the tabular calculations or (2) request a variance to the Landscape Requirements as part of the PD request. 7. Interior (parking lot) landscaping: · Include total number of parking spaces being provided on the Landscape Plan. 8. Non-vehicular Landscaping: · Site Area defined on the plat to be 6.294 acres, Landscape Plan 5.065 acres. Non Vehicular landscape requirement is based on site area, minus building area. · If the site area is 6.294 and the building area is 37,461 (assuming it includes main structure of 15,904 plus out-buildings) then 35,505 square feet of non- vehicular landscaping is required. It appears that approximately 25,500 square feet of landscaping is located in the "leg" to Coppell Road, and approximately 30,000 square feet of landscaping at the southwest and northeast comers. Therefore, this requirement appears to be satisfied, however, please verify the calculations of areas, and correct the Landscape Calculations Table. Sheet Al .3 - Exterior Elevations - Vehicle and Equipment Storage 1. Exterior appears to be mainly chain link with barbed wire along the top. Per Section 9-2-7 C. of the Coppell City Code, barbed wire is prohibited fencing material. Are their alternate (more aesthetic) materials available to be used instead of chain link? Page 2 of 3 2. Need additional notes in the Keyed Notes Legend to identify materials 9 though 13. Sheets A4.0, A4.1 and Al.5 - Exterior Elevations - Main Building and Parts Storage 1. Main building material is identified as two colors ofDrivit - which is a synthetic stucco. Need variance (via the pd?) from masonry requirement. 2. Sheet A 4.0 - Maximum size of monument sign is 60 square feet. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the November 2nd Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plats and plans to the November 2nd DRC meeting. Applicants will be asked to show, explain, and defend any revision. A representative for this project is required to attend the meeting. C. Applicant will have till noon Tuesday, November 7th to resubmit sixteen (16) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning Department Page 3 of 3 DEVELOPMENT REVIEW ENGINEERING ITEM: PD-IO8RS, Coppell Service Center. zoning change request (Planned Development-lO8) to PD-I OS-R5 (Planned Development-lOS-RS) to allow the development of a municipal service center on approximately 6.294 acres of property located along the east side of Coppell Road, south of Bethel Road, at the request of the City of Coppell. DRC DA TE: October 26, 2000 and November 2, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STATUS: ,/PRELIMINARY No comments. .. 10K29×00 08:21' C~Y ~"COPPELL a 992 30~ ?092 ? N0.058 Q~2 .... l. lllli III I II II II III I I . iiiii DEVELOPMENT REVIEW COMMI~, ~ LEI$12RE SERVICES COMMENI I iTEM: Coppel~ Sen~ice Center, Zoning Change < OCT 2 7 2000 DRC DATE: October 26, 2000 and November 2, 2000 CONTACT: Brad Reid, Park Planning and Land, cape Manager - COMMENT STATII$: PRELIMrNAR¥_~ ~ ~ No Comments DRC102600a - r~ ~ TXU TXU Electric & Gas 4200 North Belt Line Irving, TX 75038 Comments for the City of Coppell Development Review Committee October 26, 2000 PD-108R5, Coppell Service Center Zoning Change Acceptable Jeff Curry OCT 2 6 2000 City of Coppell Development Review Committee Comments Planning Deparhaent Coppell Service Center Addition, Lot 1 Block 1 West of Coppell Road, north of the D.A.R.T.R.O.W. DRC Date: October 26~h and November 2, 2000 Planning & Zoning Commission Meeting: November 16, 2000 City Council Meeting: December 12, 2000 1. This plat needs to be re-labeled MINOR PLAT, verses preliminary or final plat. 2. Need to indicate the location of Burns Street. 3. In the Owner's Dedication, change the city's name fi.om Rowlett to Coppell, and the City Manager's name from John Smith to Jim Witt. 4. Revise franchise utility signature block to reflect TXU Electric and Gas. Note: A. Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the November 2nd Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plats and plans to the November 2nd DRC meeting. Applicants will be asked to show, explain, and defend any revision. A representative for this project is required to attend the meeting. C. Applicant will have till noon Tuesday, November 7th to resubmit sixteen (16)folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning Department Page 1 of 1 DEVELOPMENT REVIEW COMME I~E°cT 2 7 2o~) ) ENGINEERING COMMENTS ITEi~: Coppell Service Center, Lot 1, Block 1, Minor Plat, to allow the development of a municipal service center on approximately 6.294 acres of property located along the east side of Coppell Road, south of Bethel Road, at the request of the City of CoppelL DRC D,4 TE: October 26, 2000 and November 2, 2000 CONT,4 CT: Mike Martin, P.E., ,4ssistant City Engineer (972-304-3679) COMMENT STATUS: ~PRELIMINARY F4NA~ ~ No comments. · . - r ~ TXU TXU Electric & Gas 4200 North Belt Line Irving, TX 75038 Comments for the City of Coppell Development Review Committee October 26, 2000 Coppell Service Center, Lot 1 Block 1, Preliminary Plat Plat Unacceptable Easements for TXU Electric and Gas facilities will be required on plat. Please contact Jeff Curry at 972-570-4126 to discuss easement requirements. Jeff Curry OCT 2 6 200O'