In this letter we wish to address three issues relating to the drainage channel work in progress in
Asbury Manor.
in you letter of June 9, 2000 you state that the new 8" tree is to be irrigated by Asbury Manor
HOA. Perhaps you are not aware that both sides of the drainage channel were irrigated by an
automatic underground spdnlder system pdor to commencement of construction. It is our
understanding that the contractor has indicated that he will restore the irrigation lines and sprinkler
heads that have been tom out in the construction process. This restoration would logically include
irrigation of the newly planted tree since it is in the area that was previously irrigated by the HOA.
Second, there has been severe settling of the grassy area up to the black metal fence line on the west
bank of the channel. This is due to the dredging of the channel. This area has settled several inches
and is now very difficult to maintain by the landscape firm that takes care of this area for the HOA. A
construction company employee has indicated that this grassy area is outside of his company's
responsibility and that we should contact you to get this problem resolved. Since this settling was
caused by disruption of the area by the contractor, we believe that the contractor should restore this
area to the condition it was prior to construction.
Third, heavy' equipment (front-end loaders and concrete trucks) have created deep ruts in the dght of
way area between Westminster Way and the sidewalk by the bridge. We assume that the contractor
will fill these ruts and sod the damaged areas so that the dght of way presents 'an image that is
expected by the City of Coppell. Also, should any sprinkler heads be damaged, we would expect fiat
the contractor would repair these.
Please communicate to us on how these issues will be addressed by the City of Coppall. Thanks for
your help in this manner. We are looking forward to the completion of this project and feel that the final
product will be esthetically pleasing to our neighborhood and to those who travel along Coppell Road.
!
;;ael~'~ly'
Asbury Manor HOA
Asbury Manor HOA
June 28,2000
ASBURY MANOR HOMEOWNERS ASSOCIATION
COPPELL, TEXAS 75019
Delivery by Fax: 972-304-3570 [
Mr. Kent M. Collins, P.E.
Civil Engineer
City of Coppell
P.O. Box 478
Coppell, TX 75019
,C31"Z) q' 62 - ~3 ~3
Dear Mr. Collins:
In this letter we wish to address three issues relating to the drainage channel work in progress in
Asbury Manor.
First, in you letter of June 9, 2000 you state that the new 8" tree is to be irrigated by Asbury Manor
HOA. Perhaps you are not aware that both sides of the drainage channel were irrigated by an
automatic underground sprinkler system prior to commencement of construction. It is our
understanding that the contractor has indicated that he will restore the irrigation lines and sprinkler
heads that have been torn out in the construction process. This restoration would logically include
irrigation of the newly planted tree since it is in the area that was previously irrigated by the HOA.
Second, there has been severe settling of the grassy area up to the black metal fence line on the west
bank of the channel. This is due to the dredging of the channel. This area has settled several inches
and is now very difficult to maintain by the landscape firm that takes care of this area for the HOA. A
construction company employee has indicated that this grassy area is outside of his company's
responsibility and that we should contact you to get this problem resolved. Since this settling was
caused by disruption of the area by the contractor, we believe that the contractor should restore this
area to the condition it was prior to construction.
Third, heavy equipment (front-end loaders and concrete trucks) have created deep ruts in the dght of
way area between Westminster Way and the sidewalk by the bddge. We assume that the contractor
will fill these ruts and sod the damaged areas so that the right of way presents an image that is
expected by the City of Coppell. Also, should any sprinkler heads be damaged, we would expect that
the contractor would repair these.
Please communicate to us on how these issues will be addressed by the City of Coppell. Thanks for
your help in this manner. We are looking forward to the completion of this project and feel that the final
product will be esthetically pleasing to our neighborhood and to those who travel along Coppell Road.
Sin ly,
Asbury Manor HOA
/.~ c per e~
Asbury Manor HOA