Brad Reid
Michael Martin
6/1/99 3:31PM
Vistas III
The total Park Development Fee owed on Phase III of Vistas is $78,385.00. The developer has agreed to
perform the design services for the trail and bridge utilizing a portion of this fee. Carter & Burgess is the
engineer on the project and Fugro South has done some field engineering. They have billed for a total of
$8,331.29 for the trail project. This should be the complete billing for the design of the trail.
Therefore, the total remaining due to the city is $70,053.71. I request, however, that the developer not be
released until the design for the bridge and abutements be turned over to the city. I have not seen the
design as of this date.
Thanks,
Brad