Loading...
Vistas of C P3-CS 990601[f~lichael Martin: vistas ~1!.1 From: To: Date: Subject: ....... ,~:"'~ ............. -" "~ .................................. Page Brad Reid Michael Martin 6/1/99 3:31PM Vistas III The total Park Development Fee owed on Phase III of Vistas is $78,385.00. The developer has agreed to perform the design services for the trail and bridge utilizing a portion of this fee. Carter & Burgess is the engineer on the project and Fugro South has done some field engineering. They have billed for a total of $8,331.29 for the trail project. This should be the complete billing for the design of the trail. Therefore, the total remaining due to the city is $70,053.71. I request, however, that the developer not be released until the design for the bridge and abutements be turned over to the city. I have not seen the design as of this date. Thanks, Brad