Loading...
Vistas of C P3-CS 990401 (2)The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 April 1, 1999 Mr. Kenny Hafner Centex Homes 2800 Surveyor Blvd Carrollton, TX 75006 RE: Street Sign Fee Assessment / Vistas of Copper 3 Dear Mr. Hafner: Enclosed with this letter you will find the street sign assessment for Vistas of Coppell 3. Prior to the final acceptance of this project, a check in the amount of $1344.39 should be made payable to the City of Copper and forwarded to Jennifer Armstrong, Finance Director, along with a copy of the attached street sign fee assessment list. Please provide a copy of your paid receipt to our office so that we will be able to verify payment of the required fees and assure a successful completion of this project. If you should have any questions please feel free to contact me at your convenience. Sincerely Kenneth M. Griffin, P.E. Director of Engineering and Public Works CC: Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Supt. Public Services Devlpfeedvsla3sgn /_-~ The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972-462-O022 FILE April 1, 1999 Mr. Kenny Hafner Centex Homes 2800 Surveyor Blvd Carrollton, TX 75006 RE: Street Sign Fee Assessment/~°fCoppeit 3 ~ Dear Mr. Hafner: Enclosed with this letter you will fred the street sign assessment for Vistas of Coppell 2C. Prior to the final acceptance of this project, a check in the amonnt of $1344.39 should be made payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of thc attached street sign fee assessment list. Please provide a copy of your paid receipt to our office so that we will be able to verify payment of the required fees and assure a successful completion of this project. If you should have any questions please feel free to contact me at your convenience. Sincerely Director of Engineering and Public Works Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Supt. Public Services Devlp~ec/vm3s~n COPPELL ENGINEERING MEMORANDUM DATE: TO: Doug Stevens, Engineering Technic=an FROM: Per ~'rdsall, Sign / Signal Technidan The following fee should be assessed and collected on the above referenced project. 100% due prior to final acceptance of project. Street Si. qns Fee The following assessment is being made in accordance with ~he City of Coppell Su~ Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pridng which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parldng ,~54.03 "-" Speed umit Street Names $111.90 ~ Yield w/names $125. 78 "- Stop w/names $144.29 ~ Warning Sign $73.46, Keep Right(median) $58.99 Object Markers(L&R) $39.98 OTHER 5(= TOTAL t544.3q * cost breakdowns may be obtained by written request signfee Revfsed 3/24/9g