Loading...
Vistas of C P3-CS 980917CASE: CITY OF COPPELL PLANNI2~G DEPARTMENT STAFF REPORT VISTAS OF COPPELL. PHASE 3: FINAL PLAT P & Z HEARING DATE: C.C. HEARING DATE: September 17, 1998 October 13, 1998 LOCATION: SIZE OF AREA: CURRENT ZONING: REQUEST: Along the south side of Spur 553, east of the Coppell Middle, School North Campus and north of Denton Creek. 21.61 acres; 61 residential lots and 3 common areas PD-SF-7 Final Plat approval. APPLICANT: Owner: Centex Homes 2800 Surveyor Blvd. Carrollton, TX 75006 (972) 417-3562 FAX: (972) 417-0422 Engineer: Carter & Burgess, Inc. 7950 Elmbrook Drive, Suite 250 Dallas, TX 75247 (214) 638-0145 FAX: (214) 638-0447 HISTORY: The City of Coppell annexed portions of Vista Ridge Business Park in 1986 and 1990, including the property currently requested for rezoning. In connection with the annexation proceedings, the City held public hearings to establish the zoning. On March 10, 1998 the Coppell City Council approved a zoning change from MF-2 to PD-SF-7. TRANSPORTATION: The S.H. 121 Bypass. will be built to freeway standards and currently contains one-way access roads, each 33 feet in width within 450 feet of right-of-way. Item # 14 SURROU-NDING LAND USE & ZONING: North- South - East- West - vacant; City of Lewisville vacant, Denton Creek, "TC' Town Center Vistas of Coppell Phase II, "PD-SF-7' Planned Development, Single-Family-7 CISD Middle School North Cam.nm and Denton Creek Elementary School, "SF-7' Single Family-7 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for medium density residential uses. DISCUSSION: The final plat as submitted conforms substantially with the approved preliminary plat. However, the drawings require a few minor corrections. These are listed as recommended conditions of approval. The approved preliminary plat, as well as this Final Plat show a decleration lane from Vista Ridge Blvd. to be installed west of Park Highlands Drive. After careful review by the Engineering Department, staff believes a decleration lane located west of Natches Trace Drive, in the existing right-of-way on the S.H. 121 Bypass frontage road, would better serve this particular subdivision. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: The planning staff recommends approval of the final plat subject to the following conditions being met: 1) 2) 3) 4) 5) 6) Consolidate Note 2 and 15 as one. Dedicate the Hike and Bike Trail easement shown along the southern property line to the City of Coppell. Show the 15' sanitary sewer easement along the southern property line. Correct the adjacent zoning shown as "HC' to "SF-7'. The homeowners association document will have to be approved by the City Attorney prior to the plat being filed with Dallas County. This property is impacted by the Park Development ordinance stipulating a fee of $1,285.00 per dwelling unit. (See Leisure Services Department comment.) Item# 14 The approved preliminary plat specifies that a decleration lane will be constructed at Park Highlands Drive. However, further investigation has led to a recommendation to relocate the proposed deceleration lane to Natches Trace, as this is the first street serving this development. This location is consistent with the placement of deceleration lanes for previous phases of Vistas of CoppeR, and should serve the development more effectively. (Engineering Department comment) ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS: 1) Final Plat 2) DeparUnental Comments Item # 14 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Vistas of CoppelE Phase 3 Final P!_a_t~ to allow the development of a 61 resMential lit subdivision on 21.61 acres of property located along the south side of Vista Ridge Boulevard and east of the Coppell MMdle School North Campus, at the request of Carter and Burgess. DRC D,4TE: .4ugust 27, 1998 to September 3,1998 CONTACT: Mike Martin, P.E., ,'lssistant City Engineer 004-3679) COMMENT STATUS: PRELIMINARy ~ P&Z The approved preliminary plat specifies that deceleration will be constructed at Park Highlands Drive. However, further investigation has lead to a recommendation to relocate the proposed deceleration lane to Natches Trace, as this is the first street serving this development. This location is consistent with the placement of deceleration lanes for previous phases of Vistas Of Coppell, and should serve the development more effectively. 09xOSX98 15:49 CITY OF COPPELL a CITY OF COPPELL DEVELOPMENT I~~ COMMFIT~ LEI$~IRE SERVIC~ COMME~I~ ~ Vi~ms o~Coppell~ ~tnaiPlat DRC DATF~ Aa~a~t 27, 1998 a.d $~p~rmb~ CONTACT: Brad Reid, Park Phnmt~g amd La~feapa Show th~ Hike ami Bike Trail easement along the sosHwm edge of the dm~l~t The developer should be aware that ~ d~elopme~t is impacted b~ the Park Development ordinance stipulating a fee of ~1,285.00 p~r dwelling melt. DRC~2798