Loading...
Vistas of C P3-CS 980513May13,1998 CENTEX HOHE= Dallas / Fort Worth Region Mr. Garreth Campbell City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019-4409 Vistas of CopPell, Phase 2C Storm Sewer Line "A" extension Dear Mr. Campbell: I appreciate you and Mike Martin meeting with me last Wednesday onsite to look at the outfall ditch and headwall on Line "A". As we discussed, we plan to remove the existing headwall and extend the existing storm sewer pipe south to intercept the existing drainage ditch which flows from the 121 Bypass. Terry Mitchell, with Carter-Burgess Engineers, will include this in the Vistas Phase 3 preliminary plat and plans to be submitted soon. Centex would like to have Final plans by August 1998 and begin onsite work immediately thereafter. Terry Mitchell believes he can satisfy city drainage requirements with the redesign to be submitted while saving some nice trees. Thank you for your cooperation in this matter and I look forward to working with the city on Vistas Phase 3. Robert Poole Land Development Manager DFW Region CC: Bennie Karncs Terry Mitchell - Carter Burgess Engineers 2800 Surveyor Boulevard, Carrollton, Texas 75006 Phone 972-417-3562 Fax 972-417-0418