Vistas of C P3-CS 980513May13,1998
CENTEX HOHE=
Dallas / Fort Worth Region
Mr. Garreth Campbell
City of Coppell
255 Parkway Blvd.
P.O. Box 478
Coppell, Texas 75019-4409
Vistas of CopPell, Phase 2C
Storm Sewer Line "A" extension
Dear Mr. Campbell:
I appreciate you and Mike Martin meeting with me last Wednesday onsite to look at the
outfall ditch and headwall on Line "A". As we discussed, we plan to remove the existing
headwall and extend the existing storm sewer pipe south to intercept the existing drainage
ditch which flows from the 121 Bypass. Terry Mitchell, with Carter-Burgess Engineers,
will include this in the Vistas Phase 3 preliminary plat and plans to be submitted soon.
Centex would like to have Final plans by August 1998 and begin onsite work
immediately thereafter. Terry Mitchell believes he can satisfy city drainage requirements
with the redesign to be submitted while saving some nice trees.
Thank you for your cooperation in this matter and I look forward to working with the city
on Vistas Phase 3.
Robert Poole
Land Development Manager
DFW Region
CC:
Bennie Karncs
Terry Mitchell - Carter Burgess Engineers
2800 Surveyor Boulevard, Carrollton, Texas 75006 Phone 972-417-3562 Fax 972-417-0418