Loading...
Warren Addition-LR 940507 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Sun Valley Custom Homes DATE: 7 May 1994 PROJECT: Warren Addition Storm Sewer Line, Coppell, TX JOB NO.: 94.1067 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Sandy Clay 2) On-Site Fill - Tan Clayey Sand with Gravel ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf ~ 14.0% Moisture 2) 117.0 pcf @ 9.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Backfill Over Sanitary Sewer Line SUBGRADE 1) approx. Station 0+30 1 Fin. Sub. 14.2 110.9 99.9 95+ -2% to +4% 2) approx. Station 1 +25 1 2'-3' 14.8 106.1 95.6 Of Optimum 3) approx. Station 2+10 2 2'-3' 1t.5 114.6 97.9 TECHNICIAN: CDJ DISTRIBUTION: (1) Sun Valley Custom Homes, Ed Flansburg (1) L. E. Delekta, Inc., Lawrence Delekta (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texea 75229 (214) 351-6419 Fax (214) 351-5148