Loading...
Warren Addition-CS 890118January 18, 1989 FROM: Steve Goram, Director of Public Wel RE: Warren Court/Deforest Road Asphalt 0 :lay Staff discussed with the county the above referenced projects in an effort to determine if the county could provide the necessary construction activity to accomplish the asphalt overlay on Deforest Road and the construction of an asphalt cul-de-sac on Warren Court. The county, as of last week, reported back to staff that due to other commitments previously planned that their time would be extremely limited and would be. unable to assist us in either project referenced above. Additionally, the county has advised that they will not be able to assist in the improvements to Bethel Road which Council authorized on December 13, 1988. They have committed to assist in the seal coating of Thweatt Road this Spring or early Summer between scheduled projects. There are two alternatives, staff will have to request proposals from our Consulting Engineer to develop specifications for the work and then go out for bids or develop specifications inhouse which will be extremely difficult with the current workload. We have requested from our Consultant all information they currently have on file concerning the Deforest Road and Warren Court projects. Staff's field observation and reviewing the plans on file at the City indicated there is not sufficient R.O.W. to construct a cul-de-sac at the end of Warren Court. We hope the information that Wayne's office can provide will give us some insight to this matter. Since no cost will be incurred we will request our Consultant to provide us with a cost estimate for performing the above work as it relates to specifications only. SGG/sm cc: Per Birdsall, Street Foreman Russell Doyle, City Engineer FORWARDED TO IA OR AND COUNCIl.