Warren Addition-CS 890223February '23, 1989 TO: Alan Ratliff, City Manager FROM: Steve Goram, Director of Publi. c Wo RE: Warren Ct., DeForest Overlay Projectf We have Just received the estimate for the consultant work order to have the information released which had been previously gathered by Ginn, Inc.. The cost of $240.00 is the estimate which would have to be funded through the project which was approved by City Council for a total amount of $50,000.00. This information is required to avoid duplication of efforts and to enlighten staff on the details which had been investigated previously by Ginn, Inc. with involvement of Dallas County R & B Dist. 1. Questions which should be answered by this information are: 1) Has the necessary right-of-way been obtained to construct the culdesac at Warren Ct.?, 2), How will the court be drained/grade?, 3) Is the culdesac to be full depth asphalt or asphalt on a prepared subgrade?, 4) Will any grades need to be changed on DeForest or drainage restored or improved to insure the longevity of the rehabilitation?. The County could and has assisted in advisory capacities on several projects, but since they per.form the aspects of rehabilitation, they do not have specifications ~hich we would require for bidding. With this information, we can procede to prepare specifications for bidding. The consultant work. order will take one week to complete after au[horization. SGG/bb cc: Frank Trando, Deputy City Manager/Finance Director RusseLl Doyle, City Engineer Per'Birdsa11, Street Foreman