Warren Addition-CS 890320March 20, 1989
TO: Alan Ratliff, City Manager
FROM: Steve Goram, Director of Public Works
RE: Warren Court Cul-de-sac
Ginn, Inc. has provided the City with the documents they have
on file in reference to the proposed cul-de-sac on Warren Court.
A cost estimate of $1,250.00 for construction has also been
provided. The cul-de-sac design is based on a 25' radius which
is necessary to stay within the existing easements.
The Subdivision Ordinance requires a minimum radius of 40' and
staff has spoken with the Fire Department concerning the 25' radius
which they do not support. Public Works concurs with the Fire
Department and if is staff's recommendation that if a cul-de-sac
is constructed on Warren Court, it is at'least 40' in radius.
The asphalt design which is attached is very temporary and would
create'a maintenance problem for our Street Department.
Staff would further recommend that Ginn, Inc. be requested to
provide engineering, specifications, inspections, and construction
cost estimates for the construction of a cul-de-sac in accordance
to Subdivision Specifications. This would have to include
consideration for land acquisition.
However, if it is Council's desire to have the cul-de-sac
constructed as depicted on the attached materials, I can ascertain
cost estimates from the County.
If you have any questions, please let me know.
SGG/sm
cc: Wesley Kilcrease, Fire Chief Richard Terry, Deputy Fire Chief
Per Birdsall, Street Foreman (w/attachments)
a USSell Doyle, City Engineer (w/attachments)
yne Ginn, Consulting Engineer