Warren Addition-CS 890417 COPPELL PUBLIC WORKS
April 17, 1989
TO: Alan Ratliff, City Manager
FROM: Steve Goram, Director of Public Works
RE: Warren Drive - Culdesac
Public Works received drawings from Ginn, Inc. made by Albert
Halff for a temporary culdesac at Warren Drive. Based on these
drawings, staff proceeded to obtain price quotes from prospective
contractors to determine if the project would require bidding.
The price quotes per Albert Halff's design have come in below
the bid limit.
The design by Albert' Halff is for a culdesac with a radius of
30' This design, in accordance to our current subdivision
ordinance, does not meet the minimum standard for a ~culdesac,
which is a 40' radius.
The Fire Department~has expressed concern for this deviation from
our current standards because it would not facilitate the access
requirements for their department.
Public Works' recommendation is to proceed to allow the Contractor
who has provided the low quote, B. J. Scott Construction Co.,
Inc., to construct the culdesac per Albert Halff's drawings, if
the radius is deemed to be within the limits of temporary
construction. B. J. Scott Construction Company's quote is for
$~,500.00.
If the temporary construction is deemed to be required to meet
current subdivision ordinance requirements of a minimum of 40'
radius, Public Works recommends submitting this project to our
Consulting Engineer to develop plans and receive bids for said
project. ~
If you have any questions please let me know.
SGG/bb
cc: Wesley Kilcrease, Fire Chief. ~ssell Doyl~ City En$ineeE
Jim Ragsdi11, Purchasing Agent Per'Birdsa11, Street F°rem~n