Loading...
Warren Addition-CS 890918 Soptember ,18, AVO 1010 Cop~ ~ Att: ~, Russell Doyle, p.~ Re: ~o~s~ ~or De~i~ of W~en D~ve ~-de-~c ~ , De~ ~. D~le: Halff Associates i~ plea~ed m ~ub~t ~ pmpo,~ ~o~ ~-de-Sac ~ the ~e~ of ~p~ Development. Our underst~n$ contemplated is aa outed ~I~: S~ of Wor~ DeM~ Phase (Ba$~ on ~g ag-f~t Radi~ ~-de~c Des!~) o ve~ ~st~ field con~ons o renew ~d u~ate e~g paMn8 pl~ o comple~ app~ pr~ess and ~io~ as req~red ~ ~e ~ of Cop~ 2. Bid Ph~e o pre.re Bidder,s Propel Fo~ o prep~e Comt~on S~~o~ b~d on ~0 Spe~fi~tions o adve~e for Bi& o ~e~e Bid Tab~ation & Re~~on for aw~ of ~n~a~ C:EP 18 "S9 16::28 P.3 The City of Copt~ll ' S~pteml:~r 18, 1~89 Page 2 3. Construction Phase o verify, ho:'izontal ~cl vertical control and establish one (1) set of stal~s for line and o make weekly site -v/sits during construction o provide construct/on mater/als tes~ng consisting of one set of moisture-clemity tests per lift of fill and two sets of concrete cyl/nders and test/nS o verify Contrac**or's Payment Requests o perform fi~/nsPection We propose to perform tk/s work on the bas/s of 2.3 times salary cost plus// re/mbursement for direct non-labor expenses, with a not-l~-exr, eed amount of Salary cost is defined by thc ASCE Manual and Report No. 45 as thc cost of salaries (including sick leave, vacation, hol/day and incentive pay applicable thereto) of pfindpah, engineers, technicians, draftsmen, stenographers, surveyors, clerks, etc., for the time d/re~ly chargeable to the projecg plus unemployment, excise, and payroll taxes; and contributions for social security, employment compensation insurance, retirement, medical, and insurance benefits, Th/s proposed budget will not be exceeded without written authorization from the C/ty of Copper Department of Publ/c Works. Excluded from the scope of the work are thc following: 1. Full-t/me Construct/on Inspection. 2. hsuance of a Certificate of Completion statin~ that all work was performed' in accordance with the plato and spec/fications (urtles~ full.t/me construction observation is provided). 3. Assistance to the Owner as an expert witm~ in any litigation with third parties, arising from the construct/on of ~ project. 4. Appearance before regulatory agencies. 5. Preparation of any special reports.