Loading...
Warren Addition-CS 940117January 17, 1994 Mr. Eugene Middleton Winkleman & Associates 12800 Hiilcrest Road Suite 200 Dallas, TX 75230 RE: Warren Crossing Development Fee Assessment Dear Mr. Middleton: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Warren Crossing. Please provide a check made payable to the City of Coppell in the amount of $8,400.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me~ Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPIVIENT FEES Date: January 17, 1994 Project: Warren Crossing TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 5,200.00 $ 5,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $1,800.00 $ 1,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permi0 Utility Final Inspection Fee $ 400.00 -0- (100%due at Issuance of Building Permi0 Water Meter Fee (Lots) $178.00 -O- (100%due at Issuance of Building Permi0 Water Meter Deposit $ 240.00 -0- (100%due at Issuance of Building Permi0 Street Light Fee * (lO0%due prior to Acceptance of Project) Park Fee $ 2,800.00 $1,400.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $12,218.00 TOTAL AMOUNT DUE PRIOR TO $ 8,400.00 COUNCIL APPROVAL + Construction Inspection Fee (2 % of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. CITY OF COPPF~LL DEVELOPMENT FEES Date: January 17, 1994 Project: Warren Crossing I TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL Water lmI~-'t Fee $ 5,200.00 $ 5,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $1,800.00 $1,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 800.00 -0- (100%due at Issuance of Building Permi0 Utility Final Inspection Fee $ 400.00 -0- (100%due at Issuance of Building Permi0 Water Metro- Fee (Lots) $178.00 -0- (100%due at Issuance of Building Permi0 Water Met~ Deposit $ 240.00 -0- (100%due at Issuance of Building Permit) Street l.~,ht Fee * (100%due prior to Acceptance of Project) Park Fee $ 2,800.00 $1,400.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $12,218.00 TOTAL AMOUNT DUE PRIOR TO $ $t400.00 COUNCIL APPROVAL + Construction Inspection Fee (2~ of Project Cost due prior to preconstmction meeting) · This fee cannot be asaessed until after TU Electric submits the lighting plan for the propm2d project. Onc~ the plan is submi_-_~, $292.60 per light will be assessed. Water ~eter Fee (Lots) ~ - 5/8" ~ 3/4" Residential Meters @ $22.25 = $~78.00 100% due prior to issuance of building permit. Water Weter Deposit 8 meters @ $30.00 ea = $240.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Park Fee 8 Residential Lots at $350.00 each = $ 2.800.00 Units (Multi family) at $350.0O each = $ For those developments having preliminary plat approval after October 26, 1993, the following assessment is determined: Residential lots at $1,285.00 ea = $ Units (Multi-Family) at $1,285.00 ea = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If yOU have any questions regarding these assessments, please advise. HLP / dm cc: Steven G. Goram Director of Public Works STREET SIGN ASSESSMENT for The following assessment is being made in'accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking S53.10 n/a Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $~.60 Stop & Street Combo $96.85 OTHER No Outlet {$~#; S65.12 No Outlet Blade $11,60 * Cost breakdowns may be obtained from Public Works by written request. FEES.HLP/WARREN