Loading...
Warren Addition-CS 940125January 25, 1994 Mr. Ed Flansburg Sun Valley Homes 2608 Belmeade Carroilton, Texas 75006 RE: Warren Crossing Development Fee Assessment Dear Mr. Flansburg: Enclosed is a revised copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Warren Crossing. Please provide a check made payable to the City of Coppell in the amount of $7,350.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Ken~neth M. Griffin, P.E. City Engineer cc: E.R. Warren, 2215 Lakeland Dr., Carrollton, TX 75006 Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES/REVISED Date: January 25, 1994 Project: Warren Crossing TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 4,550.00 $ 4,550.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 700.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $1,575.00 $ 1,575.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 700.00 -0- (100%due at Issuance of Building Permi0 Utility Final Inspection Fee $ 350.00 -0- (100%due at Issuance of Building Permi0 Water Meter Fee (Lots) $155.75 -0- (100%due at Issuance of Building Permi0 Water Meter Deposit $ 210.00 -O- (100%due at Issuance of Building Permit) Street Light Fee · (100%due prior to Acceptance of Project) Park Fee $ 2,450.00 $1,225.00 (50 % due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $10,690.75 TOTAL AMOUNT DUE PRIOR TO $ 7,350.00 COUNCIL APPROVAL + Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. DATE: 20: Ken Griffin, P.E., City Engineer FROH: Public Works Staff RE: Development Fees for Warren Crossing The following fees should be assessed and collected on the above referenced project. Water Xm~t, Fee: 7 - 518" x 314" Domestic Heter/s = ? ESU's - Irrigation Heter/s = ESU's - Fireline Neter/s = ESU's Total 7 ESU's ~ $650.00 ea = ~ 100% due prior to Council approval of the final plat. Wute~ater Impact (HOD) . ? - .X/s. ~ ~?_, Domestic Meter/s - ? ESU's Total ? ESU's ~ $225.00 ea = $~.575.00 100% due prior to Council approval of final plat. W~stewater Impact (City) - Domestic Heter/s = ESU's Total ESU's ~ $450.00 ea = $ 100% due pre_or to Council approval of the final Plat. Water Tap Inspection Fee ? Connections ~ $100.00 each = SToo.,, t00% due 'prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is ~ue prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee ? Connections @ $100.00 each ~ $700.00 100% ~ue prior to issuance of building permit. (Residential only) Utilit~ Pinal I~peGtion Pee (Ail Dvelopient) 7 lots ~ $50. O0/lot = $350.00 100% ~ue prior to issuance of building permit. Water Heter Fee (Dolestic) ? - -~/~" x _q/4" Domestic Meters ~ ~.~._~..~ ea = 5155J~ ,~ 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) - ,, ~.. Irrigation Meter/s - Fireline Meter/s ~ $ , ea = $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) ? Meters ~ 530.00 ea = _~__ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-FaMily or Won-Residential) Meters ~ 535.00 ea = $ 100% due prior to issuance of water meters, Irrig~tioD Meter Deposit Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Development Fees Page 3 P~rk Fee For those developments having preliminary plat approval prior to Juae 23, 1992 the following assessment is determined: .Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a buildilg permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: ? Residential Lots at $350.00 each = $2,450,00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer pr/or to council approval of final plat. 50% re~aining shall be paid by the Builder at such time as a buildiag permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official Development Fees Page 5 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City Of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN ~ ~ EXTENDED PRICE No Parking S53.10 Speed Li~it S63.54 Yield S58.56 Stop S65.12 Street N~e ~ Stop & Street Colabo S96.85 OTHER * Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 1/14/94