Loading...
Walgreens-CS 970520 Coppell, Texas 75019 ~----~~ The City With A Beautiful Future 214-462-0022 May 20, 1997 Bill Anderson, P.E. Dowdey, Anderson & Associates, Inc. 16250 Dallas Pkwy., Suite 100 Dallas, TX 75248 RE: Walgreens Development Fee Assessment Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $9,969.84 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, I/ Ke~eth M. Griffin, P.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg lones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Walgreens Date: 5/20/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,625.00 $5,625.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,574.01 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $2,094.84 $2,094.84 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee Need submittal of development contracts TOTAL $12,028.78 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,969.84 DEVELOPMENT FEE WORKSHEET PROJECT: Walgreens DATE: 5/20/97 Water Impact Fee: Domestic Meter(s): I - I 1/2 inch = 5 ESU's Irrigation Meter(s): I - I 1/2 inch = 5 ESU's = ESU's Fireline Meter(s): I - 6 inch = 2.5 ESU's Total #: 12.5 ESU's @ $450.00 ea. $5,625.00 {100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) {All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter{s) @ $134.93 $134.93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter{s) @ $134.93 $134.93 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: I Fireline Meter(s) @ $1,439.08 $1,439.08 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: I Meter{s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 {100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ 875.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ 8350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ 81285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $2,094.84 Street Lighting Fees: Assessed for lighting in the City's right-of-way. N/A This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the CiW's right-of-way. N/A (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Walgreens DATE: 5/20/97 ROADWAY IMPACT FEE: Service Area * 1 Category ** Commercial Land Use ** Others / Not Specified (Commercial) Building Size (Sq. Ft.) 13,905 Development Units ** 13.905 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x I (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $19,856.34 I · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in service area 1 Amoun[ of Reduction for all projects concerning Denton Tap Rd. & Sandy Lake Rd. and divide the remainder by the total $17,761.50 cost of all the projects in the service area. The calculated percentage is 10.55.