Walgreens-CS 970520 Coppell, Texas 75019
~----~~ The City With A Beautiful Future 214-462-0022
May 20, 1997
Bill Anderson, P.E.
Dowdey, Anderson & Associates, Inc.
16250 Dallas Pkwy., Suite 100
Dallas, TX 75248
RE: Walgreens
Development Fee Assessment
Dear Mr Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $9,969.84 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
I/
Ke~eth M. Griffin, P.E.
Director of Engineering & Public Works
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg lones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Walgreens
Date: 5/20/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,625.00 $5,625.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $134.93
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,574.01
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $2,094.84 $2,094.84
(100% due prior to Council Approval)
Street Light Fee N/A
(100% due prior to Acceptance of Project
Street Sign Fee N/A
(100% due prior to Acceptance of Project
Construction Inspection Fee Need submittal of
development contracts
TOTAL $12,028.78
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,969.84
DEVELOPMENT FEE WORKSHEET
PROJECT: Walgreens
DATE: 5/20/97
Water Impact Fee:
Domestic Meter(s): I - I 1/2 inch = 5 ESU's
Irrigation Meter(s): I - I 1/2 inch = 5 ESU's
= ESU's
Fireline Meter(s): I - 6 inch = 2.5 ESU's
Total #: 12.5 ESU's @ $450.00 ea. $5,625.00
{100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $150.00
(Single family due prior to issuance of building permit)
{All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter{s) @ $134.93 $134.93
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter{s) @ $134.93 $134.93
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: I Fireline Meter(s) @ $1,439.08 $1,439.08
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: I Meter{s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea. $70.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 5 @ $450.00 ea. $2,250.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
{100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ 875.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ 8350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ 81285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $2,094.84
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. N/A
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the CiW's right-of-way. N/A
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Walgreens
DATE: 5/20/97
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Commercial
Land Use ** Others / Not Specified (Commercial)
Building Size (Sq. Ft.) 13,905
Development Units ** 13.905
Vehicle Miles per Development Unit ** 4.76
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $19,856.34
I
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy
Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in service area 1 Amoun[ of Reduction
for all projects concerning Denton Tap Rd. & Sandy Lake Rd. and divide the remainder by the total $17,761.50
cost of all the projects in the service area. The calculated percentage is 10.55.