Loading...
ST9801-CS000609 (2)FAX (214) 352-3201 ~'~ /~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 June 9, 2000 Mr. Kent Collins, P.E. Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019~4409 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Mr. Collins: We have reviewed the proposed revisions (2nd iteration) to the channel and submit the following prices and quantities for the extra work required by the revisions: Reconstruct Channel Bottom and Slopes 1 LS Concrete Tree Well 20 CY Stone Veneer 225 SF 6t Grouted Rock Rip-rap 502 SY 6" Live Oak (B&B) 1 EA 8" Live Oak (B&B) 1 EA $7,900.00 per LS $1,140.00 per CY $24.50 per SF $38.00 per SY $1,310.00 per EA $1,950.00 per EA $7,900.00 $22,800.00 $5,512.50 $19,076.00 $1,310.00 $2,210.00 The quantities for the concrete tree well and the stone veneer are based upon the revised channel plan sheet issued by Freese Nichols, Inc. Our additional time requirement to complete the work associated with option 1 is fifteen (15) calendar days and for option 2 is twenty one (21) calendar days. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, RobZ~'~'. W~ber Project Engineer Company XC: Mr. Kevin C. Young, E.I.T., Freese and Nichols, Inc., 1701 N. Market Street Suite 500 LB51, Dallas, Texas 75202 AN EQUAL OPPORTUNITY EMPLOYER