ST9801-CS000608A 8 ~
P.O. BOx 478
255Pa~'wayBIvd
Coppeil. TX 75019
Phone: (972)304-3679
Fax: (972)3043570
ENGINEERING DEPARTMENT
FAX CO VER SHEET
Palm I (induding cover sheet)
CC:
Please Comment [] Please Reply
[] As Requested
.Comments:
IF YOU DO NOT RECEIVE/ILL OF THE PAGES PLRISE C/ILL (972) 304-3679
"City of Coppell Engineering- Erullence By Design"
2143523201
Se. nt By: EBCC; ,/-~. 2143523201; dun-8~ 7:51AM;
..~ ..... , .-.:": ............ ..
, ED B"I~'LL'CONSTi~TION CO'~PANY
P.O. BOX 540787
DALLAS, TX 75354-07s7
Page 1/2
FACSIMILE TKANSMITTAL SHEET
[] UXGENT 0 K~R REVI~,W
PLEASE COMMF, NT
PLEASE XEPLY
[i.
'(it4) JSS-SSSt VOICE
(Zt.t) 352'-120t FAX
Sent By: EBCC;
FAX (214) 352-3201
2143523201; Jun-8-00
.~,~
7:52AM; Page 2/2
TELEPHONE(214)358~561
ED BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540767 10605 HARRY HINES
DALLAS. TEXAS 753;54-.0787 DALLAS, TEXAS 75220
June 8, 2000
Mr. Lan'y Davis
Engineering and Public Works
City of Coppel l
255 Parkway Blvd.
Coppoll, Texas 75019-4409
Coppell Road Reconstruction
SH 121 to Sandy Lake Road
Coppell Project #: ST 98-01
Dear Larry:
It is our intent to continue making rcpairs to the concrete pavement edge and fine grading for the
next phase of concrete paving on June 10, 2000. As a result, we request that we be permitted to
work on June 10, 2000 and that the appropriate level of inspection be available on that day.
If you have any questions regarding this request, don't hesitate to contact our office.
Sim;erely,
g'lkle: 1 Constru tion Company
R~b~. Weber
Project Engineer
AN EQUALOPPORTUNITYEMPLOYER
FAX (214) 352-3201 TELEPHONE (214) 358-6581
ED BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540787 10605 HARRY HINES
DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220
June 8, 2000
Mr. Larry Davis
Engineering and Public Works
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019-4409
Re:
Coppetl Road Reconstruction
SH 121 to Sandy Lake Road
Coppell Project #: ST 98-01
Dear Larry:
It is our intent to continue making repairs to the concrete pavement edge and fine grading for the
next phase of concrete paving on June 10, 2000. As a result, we request that we be permitted to
work on June 10, 2000 and that the appropriate level of inspection be available on that day.
If you have any questions regarding this request, don't hesitate to contact our office.
Sincerely,
1Z~14Be 1 Constru t:' 3n Company
R~.X)~eb~
Project Engineer
AN EQUAL OPPORTUNITY EMPLOYER
·