Loading...
ST9801-CS000608A 8 ~ P.O. BOx 478 255Pa~'wayBIvd Coppeil. TX 75019 Phone: (972)304-3679 Fax: (972)3043570 ENGINEERING DEPARTMENT FAX CO VER SHEET Palm I (induding cover sheet) CC: Please Comment [] Please Reply [] As Requested .Comments: IF YOU DO NOT RECEIVE/ILL OF THE PAGES PLRISE C/ILL (972) 304-3679 "City of Coppell Engineering- Erullence By Design" 2143523201 Se. nt By: EBCC; ,/-~. 2143523201; dun-8~ 7:51AM; ..~ ..... , .-.:": ............ .. , ED B"I~'LL'CONSTi~TION CO'~PANY P.O. BOX 540787 DALLAS, TX 75354-07s7 Page 1/2 FACSIMILE TKANSMITTAL SHEET [] UXGENT 0 K~R REVI~,W PLEASE COMMF, NT PLEASE XEPLY [i. '(it4) JSS-SSSt VOICE (Zt.t) 352'-120t FAX Sent By: EBCC; FAX (214) 352-3201 2143523201; Jun-8-00 .~,~ 7:52AM; Page 2/2 TELEPHONE(214)358~561 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540767 10605 HARRY HINES DALLAS. TEXAS 753;54-.0787 DALLAS, TEXAS 75220 June 8, 2000 Mr. Lan'y Davis Engineering and Public Works City of Coppel l 255 Parkway Blvd. Coppoll, Texas 75019-4409 Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Larry: It is our intent to continue making rcpairs to the concrete pavement edge and fine grading for the next phase of concrete paving on June 10, 2000. As a result, we request that we be permitted to work on June 10, 2000 and that the appropriate level of inspection be available on that day. If you have any questions regarding this request, don't hesitate to contact our office. Sim;erely, g'lkle: 1 Constru tion Company R~b~. Weber Project Engineer AN EQUALOPPORTUNITYEMPLOYER FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 June 8, 2000 Mr. Larry Davis Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Coppetl Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Larry: It is our intent to continue making repairs to the concrete pavement edge and fine grading for the next phase of concrete paving on June 10, 2000. As a result, we request that we be permitted to work on June 10, 2000 and that the appropriate level of inspection be available on that day. If you have any questions regarding this request, don't hesitate to contact our office. Sincerely, 1Z~14Be 1 Constru t:' 3n Company R~.X)~eb~ Project Engineer AN EQUAL OPPORTUNITY EMPLOYER ·