Loading...
Waterside P1-CS 920429April 29, 1992 Mr. Richard Chapman David Weekley Homes 3010 LBJ Freeway, Ste. 1420 Dallas, TX 75234 Re: Waterside I Final Acceptance for Sanitary Sewer Repair Only Dear Mr. Chapman: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. The sanitary sewer has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bond has been received oa the repaired portion of the sanitary sewer and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (April 29, 1993}. Special provisions related to the installation and repair of the water meter setters and boxes has been received. (See attached} Sincerely, Larry En~ineerin§ Development Inspector CLD/bd cc: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Dale 3ackson, Building Official Mr. Randy Lockhart Mr. Mike Clark, Jones & Boyd WATFIN f J ONES & BOYD, INC. ENG NEERS · PLANNERS * CONSULTANTS 16980 Da asPa~.a-~ S~te 100 ~allas Texas 752~8 214-248 76.,-'6 ~,,~4.2~8-1-'*, May 13, 1992 OFFICERS . GreG;'f BoFd F E. Pre$oe"t ~ay ~nc S C,aca:. ~.E ExeCd: ce Vise P'esdeqt DO.]~sW Ne.port P.E. VIA DELIVERY ¥ ce P'es ASSO$1ATES Les St Joqn. P.E. Roge'z ~ S~ee:e. P.E. ~ s._ S. ¥1¢~e L C:~r~ P E. Den ~ R~mseF. q.~ _ S. Hr. Larry Davis Development Construction Inspector City of Coppell 255 Parkway Boulevard Coppe11, Texas 75019 Re: Waterside Estates, Phase 1 ~BI ProJect No. WQ 401 Dear Mr. Davis: Attached herewith for your use are one (1) set of mylars and two (2) sets of prints of the Record Drawings for remedial work performed ~o the existing sanitary sewer improvements on the referenced project. Each set includes the final plat, water and sewer plan, and sanitary sewer profiles. It is our understanding that all construction has been satisfactorily completed, the Contractor has submitted a maintenance bond, and that submittal of the Record Drawings will permit you to release a letter of acceptance for the remedial work performed. Thank you for your assistance. If you require any additional information, please call me at your convenience. Sincerely, ~ONES & BOYD, INC. ~ichael k. Clark, P.E. MLC:dlc Enclosures cc: Mr. Randy Lockhart Mr. Richard Chapman Mr. Steve Salsburg (w/one set)