Loading...
Waterside P1-CS 920226 Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 PRE-CONSTRUCTION PACKET ASTENDANCE SHEET NAME: COMPANY: PHONE: ( 1 ) CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE ~SIG~D I~PE~R: I. A~~E: (See Attached List) II. PLUS ~IS~D ~: A) CI~ ~S B) CO~~R YES C ) ~R ~S III. ~ILI~ C~I~ ~IFIED: a ) ~LEPHO~ B) C ) ~EC~IC D) C~LE T.V. E) ~R IV. STA~S OF RI~-OF-WAY ~D/OR L~ ~~S: ~BRO~ ~T YES S~T ~ ~T ~S ~RI~ PE~IT V. I~ PECTION: BE P~D BY ~ C~~R "~T O~RTI~ ~". ~~~R ~ S~-C~C~ ~ N~I~ I~~R ~T ~T ~-~ (24) H~ BE~ ~R/S~IT~Y S~R/S~ S~R/ P~VI~ C~~ION BEGINS. (2) VI. TESTING OF MATERIALS: ~ DENSITIES ~ APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-%WO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES NO B. TRAFFIC DETOUR YES NO C. WARNING LIGHTS YES NO IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMIR'12INGTHE CORRECT "AS-BUILT" PLANS TOT HE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: