Waterside P1-CS 920226 Coppell. Texas 75019
The City With A Beautiful Future 214-462-0022
PRE-CONSTRUCTION PACKET
ASTENDANCE SHEET
NAME: COMPANY: PHONE:
( 1 )
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
~SIG~D I~PE~R:
I. A~~E: (See Attached List)
II. PLUS ~IS~D ~: A) CI~ ~S
B) CO~~R YES
C ) ~R ~S
III. ~ILI~ C~I~ ~IFIED:
a ) ~LEPHO~
B)
C ) ~EC~IC
D) C~LE T.V.
E) ~R
IV. STA~S OF RI~-OF-WAY ~D/OR L~ ~~S:
~BRO~ ~T YES
S~T ~ ~T ~S
~RI~ PE~IT
V. I~ PECTION:
BE P~D BY ~ C~~R "~T O~RTI~
~".
~~~R ~ S~-C~C~ ~ N~I~
I~~R ~T ~T ~-~ (24) H~
BE~ ~R/S~IT~Y S~R/S~ S~R/
P~VI~ C~~ION BEGINS.
(2)
VI. TESTING OF MATERIALS: ~ DENSITIES
~ APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-%WO (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES NO
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMIR'12INGTHE CORRECT "AS-BUILT" PLANS TOT HE CITY.
X. INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER: