Waterside P1-CS 850401 Date= 4-1-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Waterside Estates, Phase One
A. General
1. Development Name and size= Waterside Estates, 19.45 acres
2. Owner= Triland Development Corp.
3. Engineer= Nathan D. Maier Consulting Engineers
4. Current zoning= SF
5. Current status of development: Final plat
6. Location= Lakes of Coppell, south of Parkway Blvd.
7. Proposed density= 2.8 lots per acre, 55 lots total
8. Annexation or land study required= None
9. Issues resolved= Variance for alleys
10. Issues to be resolved= Offsite drainage
11. Dedications required= None
B. Impact
1. Traffic=
a. Off-site collector streets= Parkway Blvd. 550 vpd.
b. Off-site arterial streets: MacArthur Blvd. 550 vpd.
Sandy Lake Road 300 vpd.
2. Sewer=
a. Proposed mains= 8'
b. Proposed connections to existing mains= 27~ MUD line
3. Water= 16" at Parkway Blvd.
4. Drainage or Flow= To Lakes of Coppell
5. Schools=
a. Primary school= 40 students
b. Middle school= 20 students
C. Approvals and Fees
1. Fees=
Fees Required
Item (when re~irea~ Paid to date
Preliminary Plat $ 320.00
Final Plat 1,600.00
Construction Permit Fee 19,936.00(~O ~F
Water Availability Fee 27,500.00~~f
Sewer Availability Fee 27,500.00 ~&& ~o~
Parks 8,250.00 /~ F~
2. Assessments and Pro Rata Charges:
a. Item= Street Signs
Summary: To be determined
b. Item= Street Lights
Summary: To be determine~
3. Approvals
a. Annexation N/R
b. Land study= P&Z, City Council N/R
c. Zoning= P&Z, City Council N/R
Preliminary Plat:
City Engineer: 19-90-84
Planning & Zoning: ]9-90-84
City Council: ]-99-85
e. Final Plat
City Manager:
City Engineer: 4-1-85
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period: