Loading...
Waterside P1-CS 850401 Date= 4-1-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Waterside Estates, Phase One A. General 1. Development Name and size= Waterside Estates, 19.45 acres 2. Owner= Triland Development Corp. 3. Engineer= Nathan D. Maier Consulting Engineers 4. Current zoning= SF 5. Current status of development: Final plat 6. Location= Lakes of Coppell, south of Parkway Blvd. 7. Proposed density= 2.8 lots per acre, 55 lots total 8. Annexation or land study required= None 9. Issues resolved= Variance for alleys 10. Issues to be resolved= Offsite drainage 11. Dedications required= None B. Impact 1. Traffic= a. Off-site collector streets= Parkway Blvd. 550 vpd. b. Off-site arterial streets: MacArthur Blvd. 550 vpd. Sandy Lake Road 300 vpd. 2. Sewer= a. Proposed mains= 8' b. Proposed connections to existing mains= 27~ MUD line 3. Water= 16" at Parkway Blvd. 4. Drainage or Flow= To Lakes of Coppell 5. Schools= a. Primary school= 40 students b. Middle school= 20 students C. Approvals and Fees 1. Fees= Fees Required Item (when re~irea~ Paid to date Preliminary Plat $ 320.00 Final Plat 1,600.00 Construction Permit Fee 19,936.00(~O ~F Water Availability Fee 27,500.00~~f Sewer Availability Fee 27,500.00 ~&& ~o~ Parks 8,250.00 /~ F~ 2. Assessments and Pro Rata Charges: a. Item= Street Signs Summary: To be determined b. Item= Street Lights Summary: To be determine~ 3. Approvals a. Annexation N/R b. Land study= P&Z, City Council N/R c. Zoning= P&Z, City Council N/R Preliminary Plat: City Engineer: 19-90-84 Planning & Zoning: ]9-90-84 City Council: ]-99-85 e. Final Plat City Manager: City Engineer: 4-1-85 Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: