Loading...
Waters Edge P1-CS 940609MARCIA B. SZERLIP 978 Laguna Dr. Coppeil, TX 75019 (214) 462-7809 June 9, 1994 Mr. Mike Martin Department of Engineering 255 Parkway Blvd. Coppell, TX 75019 RE: Road Improvements, Waters Edge Subdivision Dear Mr. Martin: Thank you so much for taking the time to speak with me this morning. As I advised you, I am a new resident in the Waters Edge development which is now progressing in Phase II. At the present time, the rough grading has been completed in that phase for a roadway which will run fi.om Sandy Lake through the new phase, connecting to Laguna which intersects with MacArthur. I am very much concerned, as are all my neighbors with whom I have discussed this, about the extensive amount of traffic which we anticipate will be generated by motorists using this new roadway in an attempt to avoid the Sandy Lake/MacArthur intersection. The attractiveness of this development is its quiet streets where our children can play and ride their bikes without much fear of traffic accidents. It is also enjoyable to be in our homes without the rush of vehicles up and down the streets on a constant basis. We are all fearful that we will lose the very amenities that attracted us here in the first place if efforts are not made now, before problems begin, to discourage the use of our streets as major travelling routes. It has been my experience in my many years as counsel to developers that it is far easier to address difficulties beforehand than it is to try and fix them at, er problems develop and use patterns are already in place. I hope we and Mr. Griffin will have the opportunity to meet at your earliest convenience to discuss alternatives and options. Many thanks for all your courtesies. · cc: Ken Griffin, City Engineer Mar ie a~' ~~~$~~