Loading...
Waters Edge P1-CS 930729reed engineering · GEOTECHNICAL CONSULTAN~ ~ July 29, 1993 Project No. 1132.2 Report No. 11 Matthews Investments Southwest, Inc. 5220 Spring Valley Road, Suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Waters Edge, Phase One Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the-referenced project. This report addresses the activities of July 19, 1993. On July 19, 1993, two field density tests were taken on the on-site fill material placed in the back one-forth of the residential building pad areas of Block A, Lots 5 and 6. At the time of testing, the moisture content ranged from 4.7 to 5.7 percentage points below optimum moisture, with compaction levels of 96.4 to 97.6 percent of Standard Proctor density. Test results are shown on Plate 1. If you have any questions, do not hesitate to call. Sincerely, INC. BES/RFR/wde copies submitted: (2) Matthews Investments Southwest, Inc./ Mr. Tim House (1) Nathan D. Maier Consulting Engineers/ Mr. Michael J. Garrett . ~ (1) city of Coppell/Mr. Larry Davis (1) Austin Bridge & Road/Mr. Terry Tice 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · {FAX) 214/350-OO1t~ reed engineering , WATERS EDGE; PHASE ONE COPPELL, TEXAS REPORT NO. 11 Date 07-19-93 Test No. 133 134 Lot/ Dlock A/5 A/6 Field Density Tests Depth Below Unit Final Dry S.G. Weight (feet) (Dcf) 0.0 113.0 0.0 111.6 Com- pac- Moisture tion Content Curve Level (%) No, (%) 7.9 3 97.6 6.9 3 96.4 GEOTECHNICAL CONSULTANTS Plate i