Loading...
ST9801-CS000529FAX (214) 352-3201 .,~ /~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 May 29, 2000 Mr. Kent Collins, P.E. Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Coppell Project #: ST 98-01 Dear Mr. Collins: Our box culvert subcontractor has reviewed the proposed revisions to the channel and has submitted the following prices for the extra work required by the revisions: ReconstruCt Channel Bottom and Slopes 1 LS Concrete Tree Well 15 CY Stone Veneer 145 SF 6" Grouted Rock Rip-rap 502 SY $7,900.00 per LS $1,140.00 per CY $24.50 per SF $38.00 per SY $7,900.00 $17,100.00 $3,552.50 $19,076.00 The quantities for the concrete tree well and the stone veneer are based upon the revised channel plan sheet issued by Freese Nichols, Inc. As stated during our May 25, 2000 progress meeting, it doesn't appear that the bottom of wall grades on the revised channel plan sheet are correct. Once corrected, the quantities for the concrete tree well and the stone veneer will probably increase. We will forward the requested prices for 6" and 8" live oaks when they become available. Our additional time requirement to complete the work associated with option 1 is fifteen (15) calendar days and for option 2 is twenty one (21) calendar days. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, E~:C~tru~on Company Robert D. Weber Project Engineer XC: Mr. Kevin C. Young, E.I.T., Freese and Nichols, Inc., 1701 N. Market Street Suite 500 LB51, Dallas, Texas 75202 AN EQUAL OPPORTUNITY EMPLOYER