Loading...
Waters Edge P1-CS 921130P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 PROJECT NAME: DATE: TIME: COMPANY: PHONE: (1) CITY OF COPPW. LL PRE-CONSTRUCTION CONFERENCE ASSIGNED INSPECTOR: I. ATTENDANCE: ( See Attached List ) II. PLANS FURNISHED TO: A) CITY YES B) CONTRACTOR YES C) OWNER YES III. UTILITY COMPANIES NOTIFIED: A ) T~3 .R PHONE B) GAS C ) w. LF. CTRIC D) CABLE T.V. E) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND IXDCUI~NTS: EASEMENTS YES HIG}~IAY PERMIT YES RAILROAD PERMIT YES STREET CUT PERMIT YES BORING PERMIT YES V. INS/~ION: -~. DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST ~NENTY-FOL~ (24) HOURS BEFORE WATER/SANITARY S~R/STORM SMNY_JR/ PAVING CONSTRUCTION BEGINS. (2) VI. VII. TESTING OF MATERIALS: 1. DENSITIES 2. ,APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR STREET CLOSING REQUIRED: YES __ IF YES, CONTR~£TOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-~WO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES __ B. TRAFFIC DETOUR YES C. WARNING LIGHTS YES IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTR~£TOR WTLL BE CHARGED FOR THEIR TIME. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. ADDRESS: PHONE: PROJECT MANAGER: INFORMATION: DEVELOPER: Xe CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)