Loading...
Waters Edge P1-CS 921029The City With A Beautiful Future October 29, 1992 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Three Northpark/8800 N. Central Expressway, Suite 300 Dallas, TX 75231 RE: Waters Edge Dear Mr. Daniel: The City of Coppell has received and reviewed the plans submitted for the referenced addition. These plans have been approved subject to the following items: 1) 2) 3) 4) As stated in my July 20, 1992 letter, the sidewalks along MacArthur Blvd. will be required to be constructed with the infrastructure by the developer. The note on your plans that refers to sidewalks being constructed by the home builders should be revised so that it is clear that those sidewalks along MacArthur Blvd. will be constructed by the developer. Landscape plans should be submitted, reviewed, and approved by the City. The necessary drainage easements should be provided for the system along the south side of the proposed subdivision. One joint of pipes should be stubbed out beyond the valve where the water line dead ends at the south end of Teal Lane. Once these changes have been made, the plans should be resubmitted to the City for approval Also, prior to construction, all appropriate fees should be paid and a preconstruction conference should be coordinated through Larry Davis. KMG/bd watersed