Loading...
Waters Edge P1-CS 921023NDM NATHAN D. MAII=R CONSULTING ENGINEERS, INC. October 23, 1992 Mr. Ken Orlffln, P. E. City of Coppeil 255 Parkway Bottlevard Coppell, Texa~ 75019 It ii our intent to begin gradtnl operations immediately at the above rcfcrenced pi, ojecc The contractor will bc Gregory Equipment Company. As part of their contract, Gregory is re~ponsible for the erosion control measurers ~hown on the grading plan. All fill place~ on proposed house pads and under proposed streets and alleys will be compacted under laboratory controlled conditions. Reed Engineering Group will provide thc testing service. We have a pre.construction meeting set up with Larry Davis for 9:00 a.m. on Monday, October 26. We agree to hold harmless thc City of coppell, its employees and agents for the act~ or omission of thc partie~ involved in this operation. Miclmel Dan',el MD/~h Three NerthPmrk/Oaaa N, Central Ezpwy,/Suite ~J00/Daila8, TeJtaa ?S251/(214) ?$9-4741