Waters Edge P1-CS 921023NDM
NATHAN D. MAII=R
CONSULTING ENGINEERS, INC.
October 23, 1992
Mr. Ken Orlffln, P. E.
City of Coppeil
255 Parkway Bottlevard
Coppell, Texa~ 75019
It ii our intent to begin gradtnl operations immediately at the above rcfcrenced pi, ojecc The contractor will
bc Gregory Equipment Company. As part of their contract, Gregory is re~ponsible for the erosion control
measurers ~hown on the grading plan.
All fill place~ on proposed house pads and under proposed streets and alleys will be compacted under
laboratory controlled conditions. Reed Engineering Group will provide thc testing service.
We have a pre.construction meeting set up with Larry Davis for 9:00 a.m. on Monday, October 26.
We agree to hold harmless thc City of coppell, its employees and agents for the act~ or omission of thc partie~
involved in this operation.
Miclmel Dan',el
MD/~h
Three NerthPmrk/Oaaa N, Central Ezpwy,/Suite ~J00/Daila8, TeJtaa ?S251/(214) ?$9-4741