Loading...
Waters Edge P1-CS 920521 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT WATERS EDGE ADDITION - PRELIMINARY PLAT P & Z HEARING DATE: May 21, 1992 C. C. HEARING DATE: June 9, 1992 LOCATION: 664' north of Sandy Lake Road, along the west side of MacArthur Boulevard. SIZE OF AREA: 13.3 acres and containing 48 lots. REQUEST: Approval of a preliminary plat of Waters Edge Addition. APPLICANT: Matthews Southwest Inv's. (Prospective Purchaser) Mr. Tim House 5220 Spring Valley Suite #500 Dallas, TX 75240 (214) 934-0123 N.D. Maier Engineers, Inc. (Engineer) Mr. Mike Daniel 8800 N. Central Expressway Suite #300 Dallas, TX 75231 (214) 739-4741 HISTORY: A request for SF-0 (57 dwelling units) was heard by the Planning Commission in April and was denied without prejudice by a unanimous vote. TRANSPORTATION: Sandy Lake Road is proposed to be a four-lane divided thoroughfare (C4D/6), contained within a six-lane right-of-way (110 feet); MacArthur Boulevard is a major thoroughfare (P6D), four-lane divided contained within a 100 tO 110 foot right-of-way. SURROUNDING LAND USE & ZONING: North - developed single-family; PD South - vacant; C East - CISD Elementary School under construction; MF-2 West - developing single-family; SF-9 ITEM 10 COMPREHENSIVE PLAN: The Comprehensive Plan shows low density, sinqle-family uses as being most appropriate here. ANALYSIS: Because staff recommends denial of PD zoning on this parcel, and the granting of SF-7, this plat warrants denial because it reflects a lot standard not permitted by SF-7 zoning. Several lots are too narrow, too small, and yards proposed do not conform to SF-7 development standards. ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat 3) Modify the preliminary plat ATTACHMENTS: 1) Preliminary Plat WTREDG.STF P & Z HEARING DATE: C. C. HEARING DATE: CITY OF COPPELL PLANNING DEPARTMENT CASE ~: PD-125 STAFF REPORT (WATERS EDGE ADDITION) May 21, 1992 June 9, 1992 LOCATION: 664' north of Sandy Lake Road, along the west side of MacArthur Boulevard. SIZE OF AREA: 13.3 acres and containing 48 lots. REQUEST: Approva1 of a zoning change from (TH-I) Town House-l, to (PD-SF-7) Planned Development SinGle-Family-7- APPLICANT: Matthews Southwest Inv's. (Prospective Purchaser) Mr. Tim House 5220 Spring Valley Suite #500 Dallas, TX 75240 (214) 934-0123 N.D. Maier EnGineers, Inc. (EnGineer) Mr. Mike Daniel 8800 N. Central Expressway Suite #300 Dallas, TX 75231 (214) 739-4741 HISTORY: A request for SF-0 (57 dwelling units) was heard by the Planning Commission in April and was denied without prejudice by a unanimous vote. TRANSPORTATION: Sandy Lake Road is proposed to be a four-lane divided thoroughfare (C4D/6), contained within a six-lane riGht-of-way (110 feet); MacArthur Boulevard is a major thoroughfare (P6D), four-lane divided contained within a 100 to 110 foot riGht-of-way. SURROUNDING LAND USE & ZONING: North - developed sinGle-family; PD South - vacant; C East - CISD Elementary School under construction; MF-2 West - developing sinGle-family; SF-9 ITEM 9 COMPREHENSIVE PLAN: The Comprehensive Plan shows low density, single-family uses as being most appropriate here. ANALYSIS: This is a rerun of an aborted zoning request heard by the Planning Commission in April. That request asked for SF-0 and 57 lots. At the public hearing, the Planning Commission unanimously denied (without prejudice) the applicant's proposal. The same prospective purchaser is back this month with what Planning Staff refers to as a "pseudo" PD. Although the density has been redUCed to 48 lots and the circulation system has been altered slightly, staff still has problems regarding why this request is deemed a PD - other that the fact that up to 35% of the property can be developed with less than SF-7 guidelines. The open space shown here is the same as on the earlier proposal, and will be maintained by a homeowners association, regardless of zoning granted. The open space along MacArthur Boulevard will be dictated by the Streetscape Plan, so any unique features warranted by PD zoning will occur, again regardless of zoning granted. The lack of alleys along the canal and at the southwest corner of this parcel can be addressed through the subdivision process, negating another reason for PD zoning. Finally, staff has no additional, tangible exhibits which convey a unique product here - indeed, it could be argued that this request is merely a warmed over SF-O with bigger lots. Staff recommends denial of the PD, granting of SF-7 zoning. ALTERNATIVES: 1) Approve the zoning change 2) Deny the zoning change 3) Modify the zoning change ATTACHMENTS: 1) Zoning Exhibit 2) Letter to City Engineer dated 5/8/92 3) Site Plan (Preliminary Plat) PD125.STF ;' iiiiiiiiiii" ~'" '"" .. . ,I, II !d:!, i,.~J ~,liiji i i iii iii iii "j' ~l, lJiil[ .-. · Il h ~ iijiiiiiiii '" "' J[ ~1, mlJ ,llJ,.l~,jl iJiiiJJllii, , ' ! flll"i' jllj~ ,, Iff, i,.,l '"'""'"""' ~y~jjj~j~j~j~j~j~j~j~j~j~j~j~j~jy~~~jip~j~p~qq~p~j~j~j [Jiil. I I I I I I I I I J I I I I I I i I i I I I!111111111111111111Iiillil i~JJJJjjj jjjjj jjj jjjj jjjjjj tJiJJJJjJJjJjiiJJjJJjJJjJjj [JJJJJjj jjjjjjjj j jjjjjJjJJJ JJJJJJJJJJJJ~JJJJ~JJJJJJJJJ lJli , GJliliiiiiiiiiiiJJiiJiiii Ji~lll ! ! ! I I I J ! ! I I [ J ! I I I I I ! ! I I I I ! ! I ! ! ! [ I I I ! t ] i I I ! ! I I I ! NATHAN D. MAIER Mr. Ken City Engineer 25~ Parkway Bird P.O. Box 4'/8 CoppeH, Texas 75019 Based upon your recommendation we have reviewed the Waters Edge Street locations as they relate to MacArthur Blvd. As you are aware, since the initial SF-0 submittal, we have adjusted the site plan to eliminate a number of lots and increase the lot size. This will result in about a twenty percent reduction in trip generation. The projects principal entry (at the north) provides for access to a full MacArthur median break. The southern entry provides for access to the southbound lanes of MacArthur. This order of access provides the proper and appropriate directional opportunities to drivers from the subdivision. Also the mjority of the lots face the street that a~_,~ses the median break. Any concern for U-Turn traffic at Village Parkway is minimized by the case that Village Parkway is not a collector street to the west and the majority of the subdivisions' lots face the street (Mallard Bay) with the ~ northbound median break. Over 83% of the lo~s provide alley access to within one lot of Maliard Bay Drive. The situation may be substantially minimized in that it is fully expected that with the elementary school location immediately across MacArthur, this section will be in a school zone with appropriate posted reduced speeds. A simple, but very effective, method of assuring no u-turns is to post the intersection with appropriate signage. Teal Lane should meet the city standard of a 125' minimum offset center line to center line from Village Parkway. It scales on the site plan to be approximately 200' of offset thereby providing for appropriate street Internally, providing an extremely circuitous entry route to one of the two principle entries to the subdivision in an effort to target another median break seems undesirable from a planning and traffic routing perspective. In our professional opinion, all of the noted factors, separately and in combination, provide for good planning and appropriate circulation for the Waters Edge subdivision. Sincerely, NATHAN D. MAIER Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741