Loading...
ST9601-CS 970414 TEAGUE NALL AND PERKINS C 0 N S U L T I N G E N G I N E E R S April 14, 1997 Attn: Ray Pottorf AT&T 3910 San Juanita Dallas, TX 75204 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City of Coppell, Texas Dear Mr. Pottorf: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 1972) 254-1765 (817) 336-5773 METRO (972) 251-1627 FAX {817) 336-2813 FAX {972) 251-4348 Attn: Ray Pottorf AT&T April 14, 1998 Page 8 Thank you for your cooperation and assistance. S' ely, UE NALL AND PERKINS, INC. Michael A. Jones, P.E. xc: Ken Griffin, P.E. - City of Coppell Q:\proj-r14\cp1961(>4\docs\corres\util-ltr.wIxl TEAGUE NALL AND PERKINS C 0 N S U L T I N G E N G I N E E R S April 14, 1997 Attn: Mr. J. A. Martin Lone Star Pipeline Co. 1931 East 6~h Street Irving, TX 75060 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City o.f Coppell, Texas Dear Mr. Martin: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. · The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 (972) 254-1765 (817) 336-5773 METRO (972) 251-1627 FAX (8171 336-2813 FAX {972) 251-4348 Attn: Mr. J. A. Martin Lone Star Pipeline Co. April 14, 1998 Page 6 Thank you for your cooperation and assistance. Sincerely, xc: Ken Griffin, P.E. - City of Coppell Q:'~projor14\cp196164\docs'~corres~utit-ltr.wl~l TEAGUE NALL AND PERKINS ~~ C 0 N S U L T I N G E N G I N E E R April 14, 1997 Attn: Mr. Jeff Curry Lone Star Gas Company 4200 N. Belt Line Road Irving, TX 75038 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City of Coppell, Texas Dear Mr. Curry: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 (972) 254-1765 (817) 336-5773 METRO (972) 251-1627 FAX (817} 336-2813 FAX (972) 251-4348 Attn: Mr. Jeff Curry Lone Star Gas Company April 14, 1998 Page 4 Thank you for your cooperation and assistance. Sincerely, GUE NALL PE NS, INC. xc: Ken Griffin, P.E. - City of Coppell Q:\proj-r14\cp196164\docs\corres\util-ltr. wl:M j-j J.z) TEAGUE NALL AND PERKINS C 0 N S U L T I N G E N G I N E E t~ S April 14, 1997 Ms. Mae Beth Whaley GTE 2094 McGee Lane Lewisville, TX 75067 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City Of Coppell, Texas Dear Ms. Whaley: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 (972) 254-1765 {817} 336-5773 METRO (972) 251-1627 FAX (817) 336-2813 FAX (972) 251-4348 Ms. Mae Beth Whaley GTE April 14,1998 Page 2 Thank you for your cooperation and assistance· · 1 y, T -)~ND PERKINS, INC. 1 A. Jones, . . xc: Ken Griffin, P.E. - City of Coppell Q:',proj-r14\cp196164\docs\corres\util-ltr.wpd TEAGUE NALL AND PERKINS C 0 N S U L T 1 N G E N G I N E E R S April 14, 1997 Rick Felding TU Electric 14400 Josey Lane Farmers Branch, TX 75234 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City of Coppell, Texas Dear Mr. Felding: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-Of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 (972) 254-1765 (817) 336-5773 METRO (9721 251-1627 FAX (817) 336-2813 FAX (972) 251-4348 Mr. Rick Felding TU Electric April 14, 1998 Page 2 Thank you for your cooperation and assistance. Sincerely, ichael A. Jones, xc: Ken Griffin, P.E. - City of Coppell Q:Xproj-r14\cp196164\docs\corres\util-ltr.wpd TEAGUE NALL AND PERKINS C 0 N S U L T t N G E N G I 1~' E E R S April 14, 1997 James B. Steward Sprint Communications Co. 2511 E. Grauwyler Irving, TX 75061-3410 Re: Wrangler Drive Paving, Drainage and Water Line Improvement Project (Freeport Parkway to Belt Line Road) City of Coppell, Texas Dear Mr. Steward: Enclosed are final design plans and roadway cross-sections for the Wrangler Drive improvement and reconstruction project in the City of Coppell. The typical roadway section is shown on Sheet 4 of the plans and is similar to the roadway section on Executive Drive and Airline Drive to the north of this project. Information related to existing utilities is reflected on these plans based upon information provided by the various utility companies and ties made on the ground during our field surveys. In some cases, wherever possible, adjustments have been made in the proposed design to avoid conflicts with existing utilities. Please review the enclosed plans, verify that your existing utility locations are shown correctly, identify any conflicts between your facilities and the proposed improvements and provide Ken Griffin at the City of Coppell with a schedule for your adjustment and/or relocation work on this project by May 1, 1998. With the exception of portion of the project through the undeveloped tracts between the Coppell West Middle School and Freeport Parkway on the west end of the project, the existing right-of- way as shown on the plans is available and adequate for the proposed construction. The City of Coppell is currently advertising this project for the receipt of bids and anticipates awarding a contract and beginning construction at the west end of the project by the first week in June 1998. The City is, therefore, requesting that all utility companies schedule their adjustments and/or relocations in a timely manner. Should you have any general questions regarding this project and/or the coordination of utility relocations, please contact Ken Griffin, Director of Engineering and Public Works for the City of Coppell, at (972) 304-3679. For any specific questions related to the plans or the design of the proposed improvements please feel free to give me a call at (817) 336-5773. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH. TEXAS 76102 (972) 254-1765 {817) 336-5773 METRO (972) 251-1627 FAX (817) 336-2813 FAX {972) 251-4348 James B. Steward Sprint Communications Co. April 14,1998 Page 2 Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. Michael A. Jones, P.E. xc: Ken Griffin, P.E. - City of Coppell Q:\proj-r14\cp196164Xdocs\corresXutiMtr.wpd