Loading...
Waterside P3-LR 950605FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484-8301; Fax (214) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: S~ndard Pacific of Texas Report Date: June 5, 1995 PROJECT: Waterside Estates #3, Coppell, Texas Project No.: 0751-2031 CONTRACTOI~ Cullum Construction TICKET NO.: 7010108 CONCRETE SUPPLIER: Lattimore A.M]HENT TEMP. (°F): 82 PLANT/TRUCK: 7/332 CONCRETE TEMP. (oF): 88 MIX l~ NIJMBER: 40 TIME BATCH'ED: 2:55 pm AIR (%) (aSTM C. Zal) 4.0 TIME SAMPLED: 4:15 pm WATER ADDED: 8 WEATHER CONDITION: cloudy SLUMP (inches) (ASTM C-14~) 2 LOCATION OF PLACEMENT: Inlet, station 2 + 10, Northbound Cove Road CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) WSP 9 7 05-31-95 135000 4776 3000/28 days WSP 10 28 06-21-95 WSP 11 28 06-21-95 WSP 12 Hold s~ficatiom: Makin~ & Curing: ASTM ,C-31 Tes~in~ Methods: ASTM C-143, ASTM C-39 Technician: Todd Neely FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: _~ ~1~ SMHIbr Distribution: Standard P~ifi¢ of Texas - Randy Lockhart City of Coppell - Larry Davis ~