ST9601-CS 980331 WRANGLER DRIVE PROJECT Meeting w/City- March 31, 1998 ---~1. Wage Rates 2. Erosion Control Plan ~ A,.. %,_.~.,-,, 3. Limits of Unit 1 & Unit 2 - paving and drainage 4. Reflective pavement markers for FH's & GV's - subsidiaryv"' 5. Adjustment/modification to irrigation systems - subsidiary v" Parkway restoration - block sod & hydromulch/"/-~"'e ~""' 6. 7. Temporary pavement repair for storm drain icl~,~ b~-c '~vS,~,'.,,, 9. 10. Removal o~xisting drainage pipe, etc. included in prepare right-of-way pay item 11. Cement stabilization 12. Rate of application for lime and/or cement 13. Scoring and color for sidewalk ramps/~'~,--¢,~6 14. Existing signage to be removed and replaced as part of prepare right-of- way pay item 15. Relocation of street light pole assembly v'/%~-~~''~ 16. Project signs v/ 17. Liquidated damages at $500.00/day per NCTCOG 19. 20. Pavement markings and signage/' 21. Grade adjustments ~/" ' ZZ. ScF~odl Or,Vewa, ter'na e,,