ST9601-CS 980331 WRANGLER DRIVE PROJECT
Meeting w/City- March 31, 1998
---~1. Wage Rates
2. Erosion Control Plan ~ A,.. %,_.~.,-,,
3. Limits of Unit 1 & Unit 2 - paving and drainage
4. Reflective pavement markers for FH's & GV's - subsidiaryv"'
5. Adjustment/modification to irrigation systems - subsidiary v"
Parkway restoration - block sod & hydromulch/"/-~"'e ~""'
6.
7. Temporary pavement repair for storm drain icl~,~ b~-c '~vS,~,'.,,,
9.
10. Removal o~xisting drainage pipe, etc. included in prepare right-of-way
pay item
11. Cement stabilization
12. Rate of application for lime and/or cement
13. Scoring and color for sidewalk ramps/~'~,--¢,~6
14. Existing signage to be removed and replaced as part of prepare right-of-
way pay item
15. Relocation of street light pole assembly v'/%~-~~''~
16. Project signs v/
17. Liquidated damages at $500.00/day per NCTCOG
19.
20. Pavement markings and signage/'
21. Grade adjustments ~/" '
ZZ. ScF~odl Or,Vewa, ter'na e,,