Loading...
Wellington Place-CS 860218 (2)T E R R A February 18, 1986 Mr. Ed Powell City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Wellington Place Addition Dear Ed: Mr. Joseph Lin of Javatex Corp. has asked me to write to you regarding the off-site drainage from the above referenced development. This development drains eastward onto Riverchase and Joe contacted me some time ago to coordinate the disposal of this runoff. After discussions between Nathan Maier's office, Joe, Joe's consulting engineer and me, it was determined that the optimum solution would be to discharge the water onto our property into a temporary channel and take it northward to the existing channel which runs along the south side of Sandy Lake Road. In order to protect this area from a flood event of the Elm Fork, we required that Javatex lay a storm sewer line with a flapgate at the downstream portion of the conveyance system. This line was sized to carry the runoff from Riverchase and the tract north of Wellington Place which may need to drain in that direction. Ultimately the temporary channel will be replaced with storm sewer. This will most likely be done by the apartment developer that buys this site from us. If I may be of any assistance to you in this matter, please feel free to contact me or Janet Vick at Nathan's office. Janet and I are still interested in taking you on a tour of our project. I can only imagine how deluged you must be with work, but if you get some free time, please let us know. Sincerely~,/:~.,. Mike Daniel MD/sm -Er~RA CO.%;~AN ES